• Register Now for a Free Account!
    Unlock additional site access with a free account, takes less than a minute. Register Now!

Cruising Earth

Norwegian Cruise Line Dry Dock Schedule

Norwegian Cruise Line Dry Dock Schedule 2026-2029

Norwegian Dry Dock Schedule 2026-2029

Norwegian Cruise Line - Dry Dock

The Norwegian Cruise Line's Dry Dock Schedule includes all current Norwegian ships, with details on upcoming scheduled dry docks as well as those recently completed. Cruise lines typically plan routine dry docks up to two years in advance to minimize the need to cancel or modify itineraries after bookings open. However, schedule changes are not uncommon. Unplanned events, such as significant mechanical issues, can require adjustments to the schedule, often creating a cascading effect, resulting in itinerary changes or even cancellations for two or more ships.

While sailing on a freshly refurbished ship straight out of dry dock can be a wonderful experience, a last-minute cruise cancellation due to an extended dry dock period can be deeply disappointing. We recommend keeping this possibility in mind when planning your cruise.

The information provided on this page is subject to change at any time. Report any inaccuracies or needed updates in our Norwegian Cruise Line Community Forum.

Dry Dock Schedule Last Updated: Mon Oct 12, 2026

Quick Jump to Ship

Norwegian Bliss Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
January 17, 2025 - February 2, 2025
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
Approximately two weeks
Norwegian Bliss completed a scheduled dry dock at Damen Shiprepair Brest from January 17 through February 2, 2025. The approximately two-week project combined routine technical work with significant passenger-area refurbishment. NCL added Horizon Park and updated The Haven accommodations, including three-bedroom Premiere Owner's Suites. Twenty-four balcony staterooms and two Club Balcony staterooms were added. Cagney's Steakhouse and Teppanyaki were expanded, while Palomar replaced Ocean Blue.

Norwegian Breakaway Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
February 19, 2025 - March 14, 2025
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
Approximately three weeks
Norwegian Breakaway completed a shipyard refurbishment at Damen Shiprepair Brest from February 19 through March 14, 2025, combining scheduled technical maintenance with substantial passenger-area improvements. The project introduced the Silver Screen Bistro cinema-and-dining venue, Horizon Park and The Stadium. Cagney's Steakhouse was expanded, Ocean Blue was converted to Palomar, and Vibe Beach Club and The Haven Sundeck received expanded seating and cabanas before the ship returned to service.
Previous Dry Dock
April 28, 2018 - May 8, 2018
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
11 days
Norwegian Breakaway completed a scheduled dry dock and refurbishment at Damen Shiprepair Brest. Work included repairs to shaft bearings and replacement of slewing seals on both ABB Azipods, removal and servicing of both propellers, maintenance of the three bow thrusters and two stabilizers, hull repainting, extensive replacement of interior carpeting, refreshed staterooms and public areas, and the introduction of Syd Norman’s Pour House.

Norwegian Dawn Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
April 10, 2024 - April 25, 2024
Shipyard
Chantier Naval de Marseille
Duration
16 days
Norwegian Dawn underwent a scheduled dry dock at Chantier Naval de Marseille in Marseille, France, in April 2024. The project focused primarily on routine technical maintenance and light cosmetic refurbishment rather than major venue changes. Passenger-area work included refreshed carpeting, wallpaper, tiles, painting and flooring in selected areas, while hundreds of staterooms received cosmetic improvements including refreshed furnishings and finishes and bathroom recoating. Behind-the-scenes work included replacement of insulation materials in cold rooms, galleys and accommodation areas. The ship returned to service following the maintenance and refurbishment period.
Previous Dry Dock
May 19, 2016 - June 17, 2016
Shipyard
Grand Bahama Shipyard
Duration
30 days
Norwegian Dawn completed an extensive bow-to-stern refurbishment at Grand Bahama Shipyard as part of Norwegian Cruise Line’s $400 million Norwegian Edge program. All staterooms were refurbished, the Garden Villas were completely renovated, and major public spaces including the Atrium, casino, Stardust Theater, pool deck and dining venues were extensively rebuilt or refreshed. The project also introduced Los Lobos Cantina, O’Sheehan’s Bar & Grill and Sugarcane Mojito Bar, transformed Spinnaker Lounge into Bliss Lounge, and included extensive technical maintenance.
Previous Dry Dock
May 1, 2011 - May 27, 2011
Shipyard
Grand Bahama Shipyard
Duration
27 days
Norwegian Dawn completed a nearly month-long refurbishment at Grand Bahama Shipyard before beginning its Boston season. The project added 58 accommodations, including 28 suites, introduced Moderno Churrascaria in place of Salsa, and relocated and renovated Spinnaker Lounge, Blue Lagoon, the shops, galleries and conference center. All accommodations received flat-screen televisions. The casino, children's facilities, fitness area, Garden Café, atrium and crew facilities were also renewed. Technical work included replacement of an engine, new bearings for both Azipods, hull coating and an energy-saving temperature-regulation system.

Norwegian Encore Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
November 18, 2024 - December 2, 2024
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
Approximately two weeks
Norwegian Encore underwent an extensive two-week dry dock from November 18 through December 2, 2024. The project introduced Spice H2O, an adults-only outdoor lounge replacing the former laser-tag arena, with multiple hot tubs, large day beds surrounded by cooling pools and a new bar. Cagney's Steakhouse and Teppanyaki were expanded, while Ocean Blue was converted to the Mediterranean seafood restaurant Palomar.

The two Haven Premier Owner's Suites were expanded from two to three bedrooms and now include three-and-a-half bathrooms, renovated living rooms and master bedrooms, new outdoor balcony furnishings and separate dining rooms. A portion of the Observation Lounge was converted into 24 new balcony staterooms and two Club Balcony staterooms.

Norwegian Epic Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
April 16, 2025 - May 8, 2025
Shipyard
Chantier Naval de Marseille
Duration
Approximately three weeks
Norwegian Epic completed a scheduled dry dock and refurbishment at Chantier Naval de Marseille from April 16 through May 8, 2025. In addition to technical maintenance and passenger-area refresh work, the project added a new Deck 18 hot tub, refreshed the Kids' Aqua Park and significantly expanded Vibe Beach Club with an additional hot tub, more lounge chairs and private cabanas. Eight new balcony and oceanview staterooms were also added before the ship returned to service.
Previous Dry Dock
November 5, 2020 - November 30, 2020
Shipyard
Chantier Naval de Marseille
Duration
26 days
Norwegian Epic underwent an extended technical dry dock at Chantier Naval de Marseille during the COVID-19 cruise suspension. The vessel arrived in Marseille on November 5, 2020, and entered Dry Dock No. 10 for scheduled maintenance and technical work. The project was part of Norwegian Cruise Line's fleet maintenance program during the suspension of passenger operations, allowing the vessel to undergo shipyard servicing while out of commercial service.
Previous Dry Dock
September 27, 2015 - October 17, 2015
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
21 days
Norwegian Epic completed a major three-week dry dock and refurbishment at Damen Shiprepair Brest. The project introduced The Cavern Club, Priscilla Queen of the Desert, SplashGolf and a new library and card room, while extensively renovating restaurants, the Mandara Spa, Bliss Ultra Lounge, pool deck, Epic Theater, casino and The Haven. Technical work included new Becker rudders, more efficient propeller caps, energy-efficient hull coating, and maintenance and upgrades to lifeboat release systems, thrusters, stabilizers, air ducts and refrigeration systems.

Norwegian Escape Dry Dock Schedule

Recently Completed Dry Dock
October 12, 2026 - October 27, 2026
Shipyard
Chantier Naval de Marseille
Duration
16 days
Norwegian Escape is scheduled for a significant dry dock in October 2026 during a break in service between its October 12 arrival in Barcelona and its October 28 transatlantic departure. In addition to routine technical maintenance and refurbishment work, the project is expected to include several substantial changes to the ship's dining and public spaces.

On Deck 8, Moderno Churrascaria is expected to be removed and its space incorporated into a substantially larger Cagney's Steakhouse. Bayamo by Ocean Blue is also expected to be replaced by Palomar, Norwegian Cruise Line's Mediterranean-inspired seafood specialty restaurant, with current reports indicating the new venue may also incorporate space occupied by the neighboring Pincho Tapas Bar.

The casino is expected to receive an enclosed smoking section, separating smoking gaming from the primary casino space. Additional renewal of furnishings, finishes and other hotel areas may take place during the dry dock, although Norwegian Cruise Line has not yet published a comprehensive refurbishment plan. Reports of possible changes to Vibe Beach Club and The Haven have not been sufficiently confirmed and should be considered speculative pending additional information.

Previous Dry Docks

Previous Dry Dock
September 13, 2022 - October 11, 2022
Shipyard
Chantier Naval de Marseille
Duration
29 days
Norwegian Escape underwent an unscheduled dry dock in Marseille, France, for required technical repairs and maintenance. Norwegian Cruise Line canceled several Mediterranean voyages to accommodate the shipyard visit, which followed earlier operational incidents in 2022. The project focused on technical servicing and necessary repairs rather than a major passenger-area refurbishment. The vessel returned to passenger service on October 12, 2022, sailing from Civitavecchia, Italy.
Previous Dry Dock
May 2, 2021 - May 21, 2021
Shipyard
Damen Shiprepair Rotterdam (Botlek)
Duration
20 days
Norwegian Escape underwent a 20-day dry dock in Rotterdam, Netherlands, during Norwegian Cruise Line's COVID-19 operational suspension. The shipyard period provided an opportunity for scheduled technical maintenance and servicing while the vessel remained out of passenger service. Dry Dock Logistics documented the project from May 2 through May 21, 2021, including the handling of 83 TEUs of project-related cargo. Specific refurbishment work and the shipyard facility have not been independently confirmed.

Norwegian Gem Dry Dock Schedule

Recently Completed Dry Dock
April 25, 2026 - May 11, 2026
Shipyard
Chantier Naval de Marseille
Duration
Approximately two and a half weeks
Norwegian Gem completed a scheduled dry dock at Chantier Naval de Marseille from April 25 through May 11, 2026. The approximately two-and-a-half-week project combined routine technical maintenance, class work and general refurbishment with the introduction of Vibe Beach Club on Deck 14. The adults-only outdoor venue includes premium lounge chairs, private cabanas and an additional hot tub. The ship returned to service on May 11 for its summer season in Europe.

Previous Dry Docks

Previous Dry Dock
November 16, 2022 - December 6, 2022
Shipyard
Chantier Naval de Marseille
Duration
21 days
Norwegian Gem underwent a scheduled dry dock at Chantier Naval de Marseille in Marseille, France. The three-week shipyard period included maintenance and refurbishment work while the vessel was temporarily withdrawn from passenger service. Dry Dock Logistics documented the November 16–December 6 project window, including the handling of 380 TEUs of project-related cargo. Specific technical upgrades and passenger-area modifications were not independently verified.
Previous Dry Dock
November 9, 2015 - November 22, 2015
Shipyard
Grand Bahama Shipyard
Duration
14 days
Norwegian Gem completed a scheduled dry dock and extensive refurbishment at Grand Bahama Shipyard. The project refreshed staterooms and public spaces with new carpeting, furniture and décor, renovated the Haven Courtyard, upgraded restaurants and bars, and converted the former Star Bar into O’Sheehan’s Neighborhood Bar & Grill. Technical maintenance, hull work and other routine shipyard work were also completed.

Norwegian Getaway Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
May 25, 2024 - June 5, 2024
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
12 days
Norwegian Getaway underwent a scheduled technical dry dock at Damen Shiprepair Brest in France following the completion of its Northern European cruise season. The shipyard visit focused on routine maintenance, inspections, and renovation work, with no major structural modifications or extensive passenger-area refurbishment publicly reported. The vessel subsequently resumed passenger operations from Southampton, England, on June 6, 2024.
Previous Dry Dock
May 10, 2019 - May 21, 2019
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
12 days
Norwegian Getaway completed an extensive bow-to-stern refurbishment at Damen Shiprepair Brest as part of Norwegian Cruise Line’s Norwegian Edge program. The project added Syd Norman’s Pour House and a full-service Starbucks, transformed the former library into Perspectives Photo Studio, doubled the size of Vibe Beach Club, added a water feature to Spice H2O, refreshed accommodations and public spaces, upgraded The Haven courtyard, and incorporated approximately 800 pieces of artwork throughout the ship.

Norwegian Jade Dry Dock Schedule

Recently Completed Dry Dock
April 19, 2026 - May 4, 2026
Shipyard
Seaspan Victoria Shipyards
Duration
Approximately two weeks
Norwegian Jade completed a scheduled dry dock at Seaspan Victoria Shipyards in British Columbia from April 19 through May 4, 2026. The approximately two-week project combined routine technical maintenance, statutory inspections and general refurbishment with the introduction of Vibe Beach Club on Deck 14, featuring private cabanas, premium lounge chairs and an additional hot tub. The ship returned to guest service in Vancouver on May 4 for its Alaska season.

Previous Dry Docks

Previous Dry Dock
March 10, 2017 - March 30, 2017
Shipyard
Grand Bahama Shipyard
Duration
21 days
Norwegian Jade completed an extensive three-week refurbishment at Grand Bahama Shipyard as part of Norwegian Cruise Line’s Norwegian Edge program. All staterooms were refurbished, Hawaiian-themed décor was replaced with a contemporary design, and numerous restaurants and public areas were renovated. The project added O’Sheehan’s Bar & Grill, The Pit Stop, Sugarcane Mojito Bar and Bliss Ultra Lounge, refurbished The Haven, and included new furniture, carpeting, televisions and USB charging outlets throughout the accommodations.
Previous Dry Dock
November 26, 2011 - December 8, 2011
Shipyard
Chantier Naval de Marseille
Duration
13 days
Norwegian Jade underwent a multimillion-dollar dry dock and refurbishment at Chantier Naval de Marseille in Marseille, France. The project included converting Paniolo's Tapas and Salsa restaurant into Moderno Churrascaria, replacing carpeting and tiling throughout the ship, and refreshing interior spaces. Technical maintenance included replacement of propeller and thrust bearings, servicing of Azipod propulsion system seals, and repainting the hull. The refurbishment was part of Norwegian Cruise Line's fleet enhancement program.
Previous Dry Dock
February 6, 2008 - February 12, 2008
Shipyard
Pearl Harbor Naval Shipyard
Location
Honolulu, Hawaii
Duration
7 days
Originally operating as Pride of Hawaii, the vessel underwent a wet dock conversion in Honolulu as part of its transfer from NCL America to Norwegian Cruise Line's international fleet. The ship was renamed Norwegian Jade, reflagged to the Bahamas, and received new exterior branding and preparations for European deployment. The conversion was followed by additional refurbishment work in March 2008, including installation of a casino and upgrades to passenger areas.

Norwegian Jewel Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
September 25, 2025 - October 15, 2025
Shipyard
Chantier Naval de Marseille
Duration
21 days
Norwegian Jewel completed a 21-day scheduled dry dock at Chantier Naval de Marseille from September 25 through October 15, 2025. The project combined routine technical maintenance and general refurbishment with new passenger-facing facilities.

A Vibe Beach Club was installed on Deck 14, providing an adults-only outdoor retreat with 54 premium lounge chairs, seven private cabanas and an additional hot tub. A licensed Starbucks was also added in the ship's atrium, together with minor updates to accommodations and public areas.
Previous Dry Dock
October 22, 2018 - November 5, 2018
Shipyard
Seatrium Admiralty Yard
Location
Singapore
Duration
15 days
Norwegian Jewel completed an extensive bow-to-stern refurbishment in Singapore as part of Norwegian Cruise Line’s Norwegian Edge program. All staterooms and suites were refreshed, The Haven received extensive upgrades, and numerous public spaces were renovated. The project introduced The Pit Stop and Bliss Ultra Lounge, redesigned The Atrium, upgraded restaurants and bars, refreshed pool and recreational areas, and included routine technical and maintenance work.
Previous Dry Dock
May 5, 2014 - May 15, 2014
Shipyard
BAE Systems San Francisco Ship Repair
Duration
11 days
Norwegian Jewel underwent an extensive dry dock refurbishment in San Francisco ahead of its 2014 Alaska cruise season. Improvements included the addition of O'Sheehan's Neighborhood Bar & Grill, relocation of Moderno Churrascaria, installation of Sugarcane Mojito Bar and Carlo's Bake Shop, and renovations to the casino, photo gallery, flooring, and pool deck. Technical upgrades included exhaust gas scrubbers, Azipod propulsion improvements, hull coating, shore power connectivity, lifeboat release system upgrades, thruster and stabilizer maintenance, and replacement of ballast and bilge piping. The vessel resumed passenger service on May 17, 2014.

Norwegian Joy Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
January 23, 2024 - February 11, 2024
Shipyard
Damen Shiprepair Rotterdam (Botlek)
Duration
20 days
Norwegian Joy underwent a major passenger-area refurbishment at Damen Shiprepair Rotterdam's Botlek yard. A new Thermal Suite was created in Mandara Spa & Salon, while Vibe Beach Club was expanded into the former laser-tag area with additional outdoor space and private cabanas. Twenty-four new balcony staterooms were created from part of the Observation Lounge. The ship's two Haven Premier Owner's Suites were redesigned as three-bedroom accommodations with three-and-a-half bathrooms, renovated living rooms and master bedrooms, new balcony furnishings and separate dining rooms overlooking The Haven Horizon Lounge.

Damen modified the superstructure to replace Observation Lounge windows with balconies. Both Azipods were removed for replacement of drive and non-drive bearings and slew bearings before reinstallation. The ship received a complete new paint system, including biocide-free silicone coating on its vertical hull sides to reduce fouling, friction, fuel consumption and emissions. Norwegian Joy resumed passenger service from Southampton on February 13, 2024.
Previous Dry Dock
March 11, 2019 - April 26, 2019
Shipyard
Seatrium Admiralty Yard
Location
Singapore
Duration
47 days
Norwegian Joy completed an extensive approximately $50 million refit in Singapore to reposition the ship from the Chinese market to North American service. The project redesigned accommodations and public spaces, added The Local Bar & Grill, American Diner, Starbucks and expanded entertainment offerings, converted the Galaxy Pavilion and other spaces for the North American market, and included extensive technical maintenance before the ship repositioned to Alaska.

Norwegian Pearl Dry Dock Schedule

Recently Completed Dry Dock
November 3, 2025 - November 23, 2025
Shipyard
Chantier Naval de Marseille
Duration
21 days
Norwegian Pearl underwent a scheduled refurbishment at Chantier Naval de Marseille in November 2025. The project introduced Vibe Beach Club on Deck 14, an adults-only outdoor retreat with 54 premium lounge chairs, seven private cabanas and an additional oversized hot tub. The venue provides ocean views and a full-service bar.

The ship also received routine maintenance and minor updates to accommodations and public areas before resuming cruises serving the Bahamas, Caribbean and Panama Canal region.

Previous Dry Docks

Previous Dry Dock
October 18, 2021 - December 7, 2021
Shipyard
Chantier Naval de Marseille
Duration
51 days
Norwegian Pearl underwent a Marseille shipyard project before its return to passenger operations. Chantier Naval de Marseille carried out general repairs and work on passenger interiors.
Previous Dry Dock
February 14, 2017 - February 26, 2017
Shipyard
Grand Bahama Shipyard
Duration
13 days
Norwegian Pearl completed an extensive refurbishment at Grand Bahama Shipyard as part of Norwegian Cruise Line’s Norwegian Edge program. All 1,197 staterooms were modernized with new furniture, carpeting, headboards, televisions and USB outlets, while The Haven suites and courtyard were extensively renovated. Cagney’s Steakhouse, Moderno Churrascaria, O’Sheehan’s Bar & Grill and several outdoor areas were refreshed, more than 2,200 pieces of artwork were installed, and the ship received new exhaust-gas cleaning systems.

Norwegian Sky Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
January 6, 2022 - January 23, 2022
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
18 days
Norwegian Sky completed a scheduled dry dock at Damen Shiprepair Brest. Work included hull cleaning and painting, removal and servicing of both rudders, inspection and maintenance of the propeller hubs and shaft lines, and work on the stabilizers, thrusters and other technical systems. Hotel-side maintenance included replacement of mattresses and carpeting, galley equipment work and other general maintenance.
Previous Dry Dock
January 21, 2019 - February 8, 2019
Shipyard
Grand Bahama Shipyard
Duration
19 days
Norwegian Sky completed an extensive bow-to-stern refurbishment at Grand Bahama Shipyard as part of the Norwegian Edge program. All staterooms and corridors were completely redesigned, public spaces were revitalized, and all food and beverage venues were updated. Eight new venues were introduced, including The Local Bar & Grill, La Cucina, Sugarcane Mojito Bar, Topsiders Bar, Bliss Ultra Lounge, Spinnaker Lounge, Starbucks and the new Pinnacle Lounge and Sushi Bar.
Previous Dry Dock
January 23, 2017 - January 29, 2017
Shipyard
Grand Bahama Shipyard
Duration
7 days
Norwegian Sky underwent a seven-day dry dock and refurbishment at Grand Bahama Shipyard in Freeport, Bahamas, as part of Norwegian Cruise Line's Norwegian Edge fleet enhancement program. Technical work included ultrasonic thickness measurements of pool structures, replacement of galley equipment, and overhaul of the controllable-pitch propeller and thruster systems with support from Rolls-Royce. The shipyard also provided extensive scaffolding for interior renovation projects and upgrades to selected public areas. The refurbishment included technical and guest-facing improvements rather than a complete shipwide renovation.

Norwegian Spirit Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
January 5, 2025 - January 9, 2025
Shipyard
Seatrium Admiralty Yard
Location
Singapore
Duration
5 days
Norwegian Spirit underwent a short scheduled dry dock at Seatrium Admiralty Shipyard in Singapore. Work focused on hull inspections, cleaning and repainting, machinery overhaul, classification inspections, and general maintenance of the vessel's technical systems. Minor hotel-area improvements were also reported. The project did not involve a major refurbishment or significant changes to the ship's passenger facilities, which had been extensively modernized during its 2020 renovation. Norwegian Spirit resumed passenger service on January 9, 2025.
Previous Dry Dock
January 2, 2022 - January 15, 2022
Shipyard
Seatrium Admiralty Yard
Location
Singapore
Duration
14 days
Norwegian Spirit completed a scheduled dry dock in Singapore during its extended operational pause. Work focused on routine technical and classification maintenance and inspections ahead of the ship’s return to passenger service later in 2022.
Previous Dry Dock
January 2, 2020 - February 13, 2020
Shipyard
Chantier Naval de Marseille
Duration
43 days
Norwegian Spirit completed an extensive approximately $100 million bow-to-stern refurbishment in Marseille, the largest renovation in Norwegian Cruise Line history at the time. All staterooms were modernized, public areas were extensively redesigned, and 14 new venues were introduced, including Onda by Scarpetta, The Local Bar & Grill, Silk Asian Restaurant, Taste, The Great Outdoors Bar and Waves Pool Bar. The project also expanded Mandara Spa, added the adults-only Spice H2O retreat and included extensive technical and maintenance work.

Norwegian Star Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
October 21, 2024 - November 11, 2024
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
22 days
Norwegian Star underwent an extensive technical dry dock at Damen Shiprepair Brest in France. The project included replacement of an approximately 80-ton stabilizer manufactured by Fouré Lagadec, requiring significant hull modifications to remove and install the equipment. Both Azipod propulsion units were dismantled for replacement of rotation bearings and other components. Two bow thrusters underwent detailed inspections and servicing, while the third was scheduled for replacement. Additional work included hull valve maintenance, classification inspections, hull cleaning, repairs, and repainting. The three-week project focused on major propulsion, maneuverability, and stabilization system maintenance rather than extensive passenger-area refurbishment. The ship returned to passenger service in Southampton on November 12.
Previous Dry Dock
May 16, 2018 - June 4, 2018
Shipyard
MB92 Barcelona
Location
Barcelona, Spain
Duration
20 days
Norwegian Star completed an extensive nearly three-week dry dock and bow-to-stern refurbishment in Barcelona as part of Norwegian Cruise Line’s Norwegian Edge program. Staterooms and suites were refreshed with new carpeting, furnishings and USB charging ports, while restaurants, bars, lounges and other public areas were renovated. The project introduced Sky High Bar, Bliss Ultra Lounge and the adults-only Spice H2O and included routine technical and maintenance work.
Previous Dry Dock
March 8, 2015 - March 16, 2015
Shipyard
Vigor Shipyard
Location
Portland, Oregon
Duration
9 days
Norwegian Star underwent an extensive dry dock refurbishment at Vigor Industrial in Portland, Oregon, as part of Norwegian Cruise Line's NEXT fleet enhancement program. The project introduced the Five o'Clock Somewhere Bar, O'Sheehan's Neighborhood Bar & Grill, and Sugarcane Mojito Bar, while updating Ginza Asian restaurant. Passenger-area improvements included renovations to the casino, photo gallery, pool deck, and galley facilities, replacement of carpeting, flooring, and windows, and installation of interactive digital signage. Technical work included Azipod propulsion upgrades, bow thruster and stabilizer maintenance, replacement of ballast and bilge piping, upgrades to lifeboat and tender release systems, and application of fuel-efficient silicone hull coating.
Previous Dry Dock
February 16, 2010 - February 27, 2010
Shipyard
Seaspan Victoria Shipyards
Duration
12 days
Norwegian Star underwent an extensive dry dock refurbishment at Victoria Shipyards following the unexpected cancellation of its charter as a floating hotel for the 2010 Vancouver Winter Olympics. The project involved major renovations across four fire zones, including the relocation of retail shops, conversion of former retail space into a lounge, and extensive reconfiguration of passenger accommodations and public areas. Work included new suites and staterooms, modifications to Spinnaker Lounge and the aft lounge, improvements to La Cucina restaurant and the art gallery, and conversion of the bell box area. ABB also participated in technical work involving the ship's Azipod propulsion systems. Originally planned for a later shipyard visit, the refurbishment was organized on exceptionally short notice. Norwegian Star moved from dry dock to the pier on February 28, departed Victoria on March 2, and resumed passenger service March 6.

Norwegian Sun Dry Dock Schedule

Recently Completed Dry Dock
April 2, 2026 - April 12, 2026
Shipyard
Seatrium Tuas Boulevard Yard
Location
Singapore
Duration
11 days
Norwegian Sun completed an 11-day routine dry dock in Singapore in April 2026. The ship arrived at the shipyard on April 2 and returned to passenger service on April 13.

The work was reported to include scheduled upkeep, class work and routine technical maintenance. No significant passenger-facing additions or a specific Singapore shipyard were publicly identified.

Previous Dry Docks

Previous Dry Dock
March 29, 2018 - April 18, 2018
Shipyard
Esquimalt Graving Dock
Duration
21 days
Norwegian Sun completed an extensive bow-to-stern refurbishment in Victoria as part of Norwegian Cruise Line’s Norwegian Edge program. All staterooms and suites were refreshed with new carpeting, furniture, artwork and televisions, while restaurants, bars and public areas received extensive upgrades. The project also introduced Los Lobos Cantina, Bliss Ultra Lounge and Spinnaker Lounge and included routine technical and maintenance work.
Previous Dry Dock
April 29, 2016 - May 8, 2016
Shipyard
BAE Systems San Francisco Ship Repair
Duration
10 days
Norwegian Sun underwent a scheduled dry dock and refurbishment in San Francisco as part of Norwegian Cruise Line's Norwegian Edge fleet enhancement program. Passenger-area improvements included redecoration of restaurants, bars, lounges and other public spaces, along with stateroom modernization and installation of new beds. The project also included technical upgrades and maintenance, which accounted for much of the shipyard work. The refurbishment refreshed existing accommodations and facilities rather than introducing a major new collection of onboard venues.
Previous Dry Dock
January 13, 2011 - January 24, 2011
Shipyard
Grand Bahama Shipyard
Duration
12 days
Norwegian Sun underwent a multimillion-dollar dry dock refurbishment at Grand Bahama Shipyard. The project introduced Moderno Churrascaria, a Brazilian steakhouse replacing Pacific Heights, and updated the décor of all 33 suites. The Kids Crew facilities were improved, and carpeting and wall coverings were replaced throughout public areas. Technical improvements included modifications to the propellers and rudders designed to reduce propulsion power consumption by approximately 6%, replacement of lifeboat davit hooks with upgraded safety equipment, and work on the ship's potable water piping and HVAC systems. The HVAC conservation project was expected to save approximately six million kilowatt-hours annually upon completion, while the piping replacement program continued beyond the dry dock.

Pride of America Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
May 3, 2025 - May 31, 2025
Shipyard
Vigor Shipyard
Location
Portland, Oregon
Duration
Approximately four weeks
Pride of America completed a scheduled dry dock at Vigor Shipyard in Portland, Oregon, from May 3 through May 31, 2025, combining technical maintenance and general refurbishment with significant passenger-area improvements before returning to Hawaii service. NCL added a Starbucks in the Capitol Atrium and pickleball to the sports court. Twelve new Club Balcony Suites and three inside staterooms were added on Deck 12, Splash Academy and Entourage were relocated to Deck 6, and a new Library and Card Room was created.
Previous Dry Dock
April 26, 2024 - April 28, 2024
Shipyard
Pearl Harbor Naval Shipyard
Location
Honolulu, Hawaii
Duration
3 days
Pride of America entered Dry Dock No. 4 at Pearl Harbor Naval Shipyard for a required U.S. Coast Guard hull inspection. The operation was conducted through a public-private partnership with Pacific Shipyard International, which coordinated the commercial vessel's access to the Navy facility. The ship entered dry dock Friday afternoon, underwent its hull inspection Saturday, and was refloated and departed early Sunday morning. The entire operation lasted less than 42 hours and involved regulatory inspection rather than a major refurbishment.
Previous Dry Dock
September 4, 2021 - October 2, 2021
Shipyard
Vigor Shipyard
Location
Portland, Oregon
Duration
29 days
Pride of America completed a scheduled dry dock in Portland during Norwegian Cruise Line’s pandemic-related operational pause. Work included routine technical maintenance, inspections and repairs, hull and machinery work, and general refurbishment in preparation for the ship’s eventual return to Hawaiian passenger service.
Previous Dry Dock
February 20, 2016 - March 15, 2016
Shipyard
BAE Systems San Francisco Ship Repair
Duration
25 days
Pride of America underwent a multimillion-dollar refurbishment at BAE Systems San Francisco Ship Repair as part of Norwegian Cruise Line's Norwegian Edge fleet enhancement program. Every stateroom received new bedding, furniture, flooring and flat-screen televisions. Dining venues including Skyline Main Dining Room, La Cucina, East Meets West, Cagney's Steakhouse and Jefferson's Bistro were renovated with updated décor and furnishings. New venues included Dolce Gelato, Perspectives Photo Studio and Soho Art Gallery. The pool deck received a refinished swimming pool, new loungers and Jacuzzis, while Mandara Spa was expanded with additional treatment rooms. Further improvements included renovations to the Conservatory, relocation and modernization of the wedding chapel, and upgraded library and card rooms with additional computer stations. The project also included installation of exhaust-gas cleaning equipment.
Previous Dry Dock
March 23, 2013 - April 6, 2013
Shipyard
Pearl Harbor Naval Shipyard
Location
Honolulu, Hawaii
Duration
15 days
Pride of America underwent a major $30 million dry dock refurbishment at Pearl Harbor Naval Shipyard in Honolulu. The project converted former upper-deck public spaces into 24 luxury suites, including two Deluxe Owner's Suites, and added four Studio staterooms for solo travelers and four inside staterooms on Deck 13. Dining improvements included the addition of Moderno Churrascaria Brazilian steakhouse and Cagney's Steakhouse, along with updated décor in Aloha Café. Shipwide enhancements included new carpeting, flat-screen televisions in staterooms, expanded wireless internet connectivity, upgraded audiovisual systems, improved directional signage, and renovations to the fitness center, gift shop, photo gallery, and art gallery. Environmental upgrades included installation of four Green Tech Marine exhaust-gas scrubbers serving the ship's main engines.

Plan with Confidence

Every cruise is different, and successful trip planning often means researching more than one topic. Explore additional Cruising Earth travel planning resources for information on cruise lines, cabins, dining, beverage packages, gratuities, ports of call, packing, budgeting, weather, and more. If you have questions, would like to share your experiences, or have information that could help improve these guides, we invite you to join the discussion in our Community Forums.

Back
Top