• Register Now for a Free Account!
    Unlock additional site access with your free account today, takes less than a minute, and guaranteed no spam - ever. Register Now!

Cruising Earth

Norwegian Cruise Line Dry Dock Schedule

Norwegian Cruise Line Dry Dock Schedule 2026-2029

Norwegian Dry Dock Schedule 2026-2029

Norwegian Cruise Line - Dry Dock

The Norwegian Cruise Line's Dry Dock Schedule includes all current Norwegian ships, with details on upcoming scheduled dry docks as well as those recently completed. Cruise lines typically plan routine dry docks up to two years in advance to minimize the need to cancel or modify itineraries after bookings open. However, schedule changes are not uncommon. Unplanned events, such as significant mechanical issues, can require adjustments to the schedule, often creating a cascading effect, resulting in itinerary changes or even cancellations for two or more ships.

While sailing on a freshly refurbished ship straight out of dry dock can be a wonderful experience, a last-minute cruise cancellation due to an extended dry dock period can be deeply disappointing. We recommend keeping this possibility in mind when planning your cruise.

The information provided on this page is subject to change at any time. Report any inaccuracies or needed updates in our Norwegian Cruise Line Community Forum.

Dry Dock Schedule Last Updated: Thu Sep 24, 2026

Quick Jump to Ship

Norwegian Bliss Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
January 17, 2025 - February 2, 2025
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
Approximately two weeks
Norwegian Bliss completed a scheduled dry dock at Damen Shiprepair Brest from January 17 through February 2, 2025. The approximately two-week project combined routine technical work with significant passenger-area refurbishment. NCL added Horizon Park and updated The Haven accommodations, including three-bedroom Premiere Owner's Suites. Twenty-four balcony staterooms and two Club Balcony staterooms were added. Cagney's Steakhouse and Teppanyaki were expanded, while Palomar replaced Ocean Blue.

Norwegian Breakaway Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
February 19, 2025 - March 14, 2025
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
Approximately three weeks
Norwegian Breakaway completed a shipyard refurbishment at Damen Shiprepair Brest from February 19 through March 14, 2025, combining scheduled technical maintenance with substantial passenger-area improvements. The project introduced the Silver Screen Bistro cinema-and-dining venue, Horizon Park and The Stadium. Cagney's Steakhouse was expanded, Ocean Blue was converted to Palomar, and Vibe Beach Club and The Haven Sundeck received expanded seating and cabanas before the ship returned to service.
Previous Dry Dock
April 28, 2018 - May 8, 2018
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
11 days
Norwegian Breakaway completed a scheduled dry dock and refurbishment at Damen Shiprepair Brest. Work included repairs to shaft bearings and replacement of slewing seals on both ABB Azipods, removal and servicing of both propellers, maintenance of the three bow thrusters and two stabilizers, hull repainting, extensive replacement of interior carpeting, refreshed staterooms and public areas, and the introduction of Syd Norman’s Pour House.

Norwegian Dawn Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
April 10, 2024 - April 25, 2024
Shipyard
Chantier Naval de Marseille
Duration
16 days
Norwegian Dawn underwent a scheduled dry dock at Chantier Naval de Marseille in Marseille, France, in April 2024. The project focused primarily on routine technical maintenance and light cosmetic refurbishment rather than major venue changes. Passenger-area work included refreshed carpeting, wallpaper, tiles, painting and flooring in selected areas, while hundreds of staterooms received cosmetic improvements including refreshed furnishings and finishes and bathroom recoating. Behind-the-scenes work included replacement of insulation materials in cold rooms, galleys and accommodation areas. The ship returned to service following the maintenance and refurbishment period.
Previous Dry Dock
May 19, 2016 - June 17, 2016
Shipyard
Grand Bahama Shipyard
Duration
30 days
Norwegian Dawn completed an extensive bow-to-stern refurbishment at Grand Bahama Shipyard as part of Norwegian Cruise Line’s $400 million Norwegian Edge program. All staterooms were refurbished, the Garden Villas were completely renovated, and major public spaces including the Atrium, casino, Stardust Theater, pool deck and dining venues were extensively rebuilt or refreshed. The project also introduced Los Lobos Cantina, O’Sheehan’s Bar & Grill and Sugarcane Mojito Bar, transformed Spinnaker Lounge into Bliss Lounge, and included extensive technical maintenance.

Norwegian Encore Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
November 18, 2024 - December 2, 2024
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
Approximately two weeks
Norwegian Encore underwent an extensive two-week dry dock from November 18 through December 2, 2024. The project introduced Spice H2O, an adults-only outdoor lounge replacing the former laser-tag arena, with multiple hot tubs, large day beds surrounded by cooling pools and a new bar. Cagney's Steakhouse and Teppanyaki were expanded, while Ocean Blue was converted to the Mediterranean seafood restaurant Palomar.

The two Haven Premier Owner's Suites were expanded from two to three bedrooms and now include three-and-a-half bathrooms, renovated living rooms and master bedrooms, new outdoor balcony furnishings and separate dining rooms. A portion of the Observation Lounge was converted into 24 new balcony staterooms and two Club Balcony staterooms.

Norwegian Epic Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
April 16, 2025 - May 8, 2025
Shipyard
Chantier Naval de Marseille
Duration
Approximately three weeks
Norwegian Epic completed a scheduled dry dock and refurbishment at Chantier Naval de Marseille from April 16 through May 8, 2025. In addition to technical maintenance and passenger-area refresh work, the project added a new Deck 18 hot tub, refreshed the Kids' Aqua Park and significantly expanded Vibe Beach Club with an additional hot tub, more lounge chairs and private cabanas. Eight new balcony and oceanview staterooms were also added before the ship returned to service.
Previous Dry Dock
September 27, 2015 - October 17, 2015
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
21 days
Norwegian Epic completed a major three-week dry dock and refurbishment at Damen Shiprepair Brest. The project introduced The Cavern Club, Priscilla Queen of the Desert, SplashGolf and a new library and card room, while extensively renovating restaurants, the Mandara Spa, Bliss Ultra Lounge, pool deck, Epic Theater, casino and The Haven. Technical work included new Becker rudders, more efficient propeller caps, energy-efficient hull coating, and maintenance and upgrades to lifeboat release systems, thrusters, stabilizers, air ducts and refrigeration systems.

Norwegian Escape Dry Dock Schedule

Next Scheduled Dry Dock
October 12, 2026 - October 27, 2026
Location
Europe
Duration
16 days
Norwegian Escape is scheduled for a significant dry dock in October 2026 during a break in service between its October 12 arrival in Barcelona and its October 28 transatlantic departure. In addition to routine technical maintenance and refurbishment work, the project is expected to include several substantial changes to the ship's dining and public spaces.

On Deck 8, Moderno Churrascaria is expected to be removed and its space incorporated into a substantially larger Cagney's Steakhouse. Bayamo by Ocean Blue is also expected to be replaced by Palomar, Norwegian Cruise Line's Mediterranean-inspired seafood specialty restaurant, with current reports indicating the new venue may also incorporate space occupied by the neighboring Pincho Tapas Bar.

The casino is expected to receive an enclosed smoking section, separating smoking gaming from the primary casino space. Additional renewal of furnishings, finishes and other hotel areas may take place during the dry dock, although Norwegian Cruise Line has not yet published a comprehensive refurbishment plan. Reports of possible changes to Vibe Beach Club and The Haven have not been sufficiently confirmed and should be considered speculative pending additional information.

Norwegian Gem Dry Dock Schedule

Recently Completed Dry Dock
April 25, 2026 - May 11, 2026
Shipyard
Chantier Naval de Marseille
Duration
Approximately two and a half weeks
Norwegian Gem completed a scheduled dry dock at Chantier Naval de Marseille from April 25 through May 11, 2026. The approximately two-and-a-half-week project combined routine technical maintenance, class work and general refurbishment with the introduction of Vibe Beach Club on Deck 14. The adults-only outdoor venue includes premium lounge chairs, private cabanas and an additional hot tub. The ship returned to service on May 11 for its summer season in Europe.

Previous Dry Docks

Previous Dry Dock
November 9, 2015 - November 22, 2015
Shipyard
Grand Bahama Shipyard
Duration
14 days
Norwegian Gem completed a scheduled dry dock and extensive refurbishment at Grand Bahama Shipyard. The project refreshed staterooms and public spaces with new carpeting, furniture and décor, renovated the Haven Courtyard, upgraded restaurants and bars, and converted the former Star Bar into O’Sheehan’s Neighborhood Bar & Grill. Technical maintenance, hull work and other routine shipyard work were also completed.

Norwegian Getaway Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
May 10, 2019 - May 21, 2019
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
12 days
Norwegian Getaway completed an extensive bow-to-stern refurbishment at Damen Shiprepair Brest as part of Norwegian Cruise Line’s Norwegian Edge program. The project added Syd Norman’s Pour House and a full-service Starbucks, transformed the former library into Perspectives Photo Studio, doubled the size of Vibe Beach Club, added a water feature to Spice H2O, refreshed accommodations and public spaces, upgraded The Haven courtyard, and incorporated approximately 800 pieces of artwork throughout the ship.

Norwegian Jade Dry Dock Schedule

Recently Completed Dry Dock
April 19, 2026 - May 4, 2026
Shipyard
Seaspan Victoria Shipyards
Duration
Approximately two weeks
Norwegian Jade completed a scheduled dry dock at Seaspan Victoria Shipyards in British Columbia from April 19 through May 4, 2026. The approximately two-week project combined routine technical maintenance, statutory inspections and general refurbishment with the introduction of Vibe Beach Club on Deck 14, featuring private cabanas, premium lounge chairs and an additional hot tub. The ship returned to guest service in Vancouver on May 4 for its Alaska season.

Previous Dry Docks

Previous Dry Dock
March 10, 2017 - March 30, 2017
Shipyard
Grand Bahama Shipyard
Duration
21 days
Norwegian Jade completed an extensive three-week refurbishment at Grand Bahama Shipyard as part of Norwegian Cruise Line’s Norwegian Edge program. All staterooms were refurbished, Hawaiian-themed décor was replaced with a contemporary design, and numerous restaurants and public areas were renovated. The project added O’Sheehan’s Bar & Grill, The Pit Stop, Sugarcane Mojito Bar and Bliss Ultra Lounge, refurbished The Haven, and included new furniture, carpeting, televisions and USB charging outlets throughout the accommodations.

Norwegian Jewel Dry Dock Schedule

Recently Completed Dry Dock
September 25, 2025 - October 15, 2025
Shipyard
Chantier Naval de Marseille
Duration
21 days
Norwegian Jewel completed a 21-day scheduled dry dock at Chantier Naval de Marseille from September 25 through October 15, 2025. The project combined routine technical maintenance and general refurbishment with new passenger-facing facilities.

A Vibe Beach Club was installed on Deck 14, providing an adults-only outdoor retreat with 54 premium lounge chairs, seven private cabanas and an additional hot tub. A licensed Starbucks was also added in the ship's atrium, together with minor updates to accommodations and public areas.

Previous Dry Docks

Previous Dry Dock
October 22, 2018 - November 5, 2018
Shipyard
Seatrium Admiralty Yard
Location
Singapore
Duration
15 days
Norwegian Jewel completed an extensive bow-to-stern refurbishment in Singapore as part of Norwegian Cruise Line’s Norwegian Edge program. All staterooms and suites were refreshed, The Haven received extensive upgrades, and numerous public spaces were renovated. The project introduced The Pit Stop and Bliss Ultra Lounge, redesigned The Atrium, upgraded restaurants and bars, refreshed pool and recreational areas, and included routine technical and maintenance work.

Norwegian Joy Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
2024
Shipyard
Damen Shiprepair Rotterdam (Botlek)
Norwegian Joy underwent a three-week dry dock from January 22 through February 12, 2024 that introduced significant passenger-area improvements. A new Thermal Suite was created in Mandara Spa & Salon, while Vibe Beach Club was expanded into the former laser-tag area with additional outdoor space and private cabanas.

Twenty-four new balcony staterooms were created from part of the Observation Lounge. The ship's two Haven Premier Owner's Suites were redesigned as three-bedroom accommodations with three-and-a-half bathrooms, renovated living rooms and master bedrooms, new balcony furnishings and separate dining rooms overlooking The Haven Horizon Lounge. Norwegian Joy resumed passenger service on February 13, 2024.
Previous Dry Dock
March 11, 2019 - April 26, 2019
Shipyard
Seatrium Admiralty Yard
Location
Singapore
Duration
47 days
Norwegian Joy completed an extensive approximately $50 million refit in Singapore to reposition the ship from the Chinese market to North American service. The project redesigned accommodations and public spaces, added The Local Bar & Grill, American Diner, Starbucks and expanded entertainment offerings, converted the Galaxy Pavilion and other spaces for the North American market, and included extensive technical maintenance before the ship repositioned to Alaska.

Norwegian Pearl Dry Dock Schedule

Recently Completed Dry Dock
November 3, 2025 - November 23, 2025
Shipyard
Chantier Naval de Marseille
Duration
21 days
Norwegian Pearl underwent a 21-day scheduled refurbishment from November 3 through November 23, 2025. The project introduced Vibe Beach Club on Deck 14, an adults-only outdoor retreat with premium lounge chairs, seven private cabanas and an oversized additional hot tub.

The ship also received routine maintenance and minor updates to accommodations and public areas before resuming cruises from Miami to the Bahamas, Caribbean and Panama Canal region. A specific shipyard was not established by the reviewed sources.

Previous Dry Docks

Previous Dry Dock
February 14, 2017 - February 26, 2017
Shipyard
Grand Bahama Shipyard
Duration
13 days
Norwegian Pearl completed an extensive refurbishment at Grand Bahama Shipyard as part of Norwegian Cruise Line’s Norwegian Edge program. All 1,197 staterooms were modernized with new furniture, carpeting, headboards, televisions and USB outlets, while The Haven suites and courtyard were extensively renovated. Cagney’s Steakhouse, Moderno Churrascaria, O’Sheehan’s Bar & Grill and several outdoor areas were refreshed, more than 2,200 pieces of artwork were installed, and the ship received new exhaust-gas cleaning systems.

Norwegian Sky Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
January 6, 2022 - January 23, 2022
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
18 days
Norwegian Sky completed a scheduled dry dock at Damen Shiprepair Brest. Work included hull cleaning and painting, removal and servicing of both rudders, inspection and maintenance of the propeller hubs and shaft lines, and work on the stabilizers, thrusters and other technical systems. Hotel-side maintenance included replacement of mattresses and carpeting, galley equipment work and other general maintenance.
Previous Dry Dock
January 21, 2019 - February 8, 2019
Shipyard
Grand Bahama Shipyard
Duration
19 days
Norwegian Sky completed an extensive bow-to-stern refurbishment at Grand Bahama Shipyard as part of the Norwegian Edge program. All staterooms and corridors were completely redesigned, public spaces were revitalized, and all food and beverage venues were updated. Eight new venues were introduced, including The Local Bar & Grill, La Cucina, Sugarcane Mojito Bar, Topsiders Bar, Bliss Ultra Lounge, Spinnaker Lounge, Starbucks and the new Pinnacle Lounge and Sushi Bar.

Norwegian Spirit Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
January 2, 2022 - January 15, 2022
Shipyard
Seatrium Admiralty Yard
Location
Singapore
Duration
14 days
Norwegian Spirit completed a scheduled dry dock in Singapore during its extended operational pause. Work focused on routine technical and classification maintenance and inspections ahead of the ship’s return to passenger service later in 2022.
Previous Dry Dock
January 2, 2020 - February 13, 2020
Shipyard
Chantier Naval de Marseille
Duration
43 days
Norwegian Spirit completed an extensive approximately $100 million bow-to-stern refurbishment in Marseille, the largest renovation in Norwegian Cruise Line history at the time. All staterooms were modernized, public areas were extensively redesigned, and 14 new venues were introduced, including Onda by Scarpetta, The Local Bar & Grill, Silk Asian Restaurant, Taste, The Great Outdoors Bar and Waves Pool Bar. The project also expanded Mandara Spa, added the adults-only Spice H2O retreat and included extensive technical and maintenance work.

Norwegian Star Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
November 2024
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Norwegian Star underwent an approximately three-week scheduled dry dock at Damen Shiprepair Brest in France from late October into November 2024. The technical project included replacement of an approximately 80-ton stabilizer, dismantling and rebuilding of both azipods with new components, servicing of all three bow thrusters, class inspections and hull-valve maintenance. The hull was also cleaned and painted, with general maintenance and refurbishment completed before the ship returned to service.
Previous Dry Dock
May 16, 2018 - June 4, 2018
Shipyard
MB92 Barcelona
Location
Barcelona, Spain
Duration
20 days
Norwegian Star completed an extensive nearly three-week dry dock and bow-to-stern refurbishment in Barcelona as part of Norwegian Cruise Line’s Norwegian Edge program. Staterooms and suites were refreshed with new carpeting, furnishings and USB charging ports, while restaurants, bars, lounges and other public areas were renovated. The project introduced Sky High Bar, Bliss Ultra Lounge and the adults-only Spice H2O and included routine technical and maintenance work.

Norwegian Sun Dry Dock Schedule

Recently Completed Dry Dock
April 2, 2026 - April 12, 2026
Shipyard
Seatrium Tuas Boulevard Yard
Location
Singapore
Duration
11 days
Norwegian Sun completed an 11-day routine dry dock in Singapore in April 2026. The ship arrived at the shipyard on April 2 and returned to passenger service on April 13.

The work was reported to include scheduled upkeep, class work and routine technical maintenance. No significant passenger-facing additions or a specific Singapore shipyard were publicly identified.

Previous Dry Docks

Previous Dry Dock
March 29, 2018 - April 18, 2018
Shipyard
Esquimalt Graving Dock
Duration
21 days
Norwegian Sun completed an extensive bow-to-stern refurbishment in Victoria as part of Norwegian Cruise Line’s Norwegian Edge program. All staterooms and suites were refreshed with new carpeting, furniture, artwork and televisions, while restaurants, bars and public areas received extensive upgrades. The project also introduced Los Lobos Cantina, Bliss Ultra Lounge and Spinnaker Lounge and included routine technical and maintenance work.

Pride of America Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
May 3, 2025 - May 31, 2025
Shipyard
Vigor Shipyard
Location
Portland, Oregon
Duration
Approximately four weeks
Pride of America completed a scheduled dry dock at Vigor Shipyard in Portland, Oregon, from May 3 through May 31, 2025, combining technical maintenance and general refurbishment with significant passenger-area improvements before returning to Hawaii service. NCL added a Starbucks in the Capitol Atrium and pickleball to the sports court. Twelve new Club Balcony Suites and three inside staterooms were added on Deck 12, Splash Academy and Entourage were relocated to Deck 6, and a new Library and Card Room was created.
Previous Dry Dock
September 4, 2021 - October 2, 2021
Shipyard
Vigor Shipyard
Location
Portland, Oregon
Duration
29 days
Pride of America completed a scheduled dry dock in Portland during Norwegian Cruise Line’s pandemic-related operational pause. Work included routine technical maintenance, inspections and repairs, hull and machinery work, and general refurbishment in preparation for the ship’s eventual return to Hawaiian passenger service.
Previous Dry Dock
February 20, 2016 - March 15, 2016
Shipyard
BAE Systems San Francisco Ship Repair
Duration
25 days
Pride of America completed an extensive multimillion-dollar dry dock and refurbishment in San Francisco as part of Norwegian Cruise Line’s Norwegian Edge program. Every stateroom received new bedding, furniture, flooring and flat-screen televisions, while restaurants, bars, lounges and other public spaces were extensively renovated. The project added Dolce Gelato, Perspectives Photo Studio and Soho Art Gallery, expanded the Mandara Spa, completely refurbished the pool deck and included installation of new exhaust-gas cleaning systems.

Plan with Confidence

Every cruise is different, and successful trip planning often means researching more than one topic. Explore additional Cruising Earth travel planning resources for information on cruise lines, cabins, dining, beverage packages, gratuities, ports of call, packing, budgeting, weather, and more. If you have questions, would like to share your experiences, or have information that could help improve these guides, we invite you to join the discussion in our Community Forums.

Back
Top