• Register Now for a Free Account!
    Unlock additional site access with your free account today, takes less than a minute, and guaranteed no spam - ever. Register Now!

Cruising Earth

Vision of the Seas Cruise Ship Tracker

Vision of the Seas Real-Time Cruise Ship Tracking

Vision of the Seas Cruise Ship Tracking Map

Loading tracking map...
Loading tracking map...
Tracking Map Legend:
  • Cargo
  • Tanker
  • Cruise / Passenger
  • High Speed
  • Military / Special
  • Fishing
  • Pleasure
  • Unknown

Vision of the Seas Cruise Ship Details

In Service:1998 | 28 years
Last Refurb:NA
Class:Vision
Builder:Chantiers de L'Atlantique
Build Location:Saint-Nazaire, France
Call Sign:C6SE8
Flagged Country:Bahamas
Passengers:2,435
Crew:765
Gross Tons:78,340 GT
Length: 915.4 ft
Beam: 117.0 ft
Draft: 25.5 ft
Speed: 22.0 knots / 25.3 mph
Staterooms:NA

The Vision class cruise ships were built between 1995 and 1998 for Royal Caribbean International and were among the first modern mega-ships with spacious design. The ships feature extensive outdoor promenades and multiple pools with a wide variety of dining and entertainment options. The class introduced the first rock-climbing wall at sea and was designed for family-friendly cruising. The vessels include large open deck spaces and reliable performance.

Vision of the Seas Dry Dock History

Previous Dry Dock
April 20, 2024 - May 24, 2024
Shipyard
Grand Bahama Shipyard
Duration
35 days
Vision of the Seas completed a scheduled dry dock at Grand Bahama Shipyard from April 20 through May 24, 2024. The project covered routine maintenance, classification and safety inspections, technical overhaul, hotel upkeep and updates to selected public areas.
Previous Dry Dock
February 4, 2022 - February 24, 2022
Shipyard
Grand Bahama Shipyard
Duration
21 days
Vision of the Seas underwent a 27-day scheduled dry dock at Grand Bahama Shipyard while the ship remained out of passenger service during the COVID-19 operational pause. The project was a technical maintenance and classification dry dock rather than a major refurbishment, covering required class work, inspections, machinery and marine-system maintenance, underwater-hull work and general ship upkeep.
Previous Dry Dock
November 10, 2018 - November 24, 2018
Shipyard
Grand Bahama Shipyard
Duration
15 days
Vision of the Seas underwent a scheduled maintenance dry dock focused primarily on technical servicing, classification work, hull maintenance and general shipboard upkeep rather than a major passenger-area modernization. Contemporary post-drydock reporting specifically describes the November yard period as maintenance rather than refurbishment.
Previous Dry Dock
September 29, 2013 - October 23, 2013
Shipyard
Navantia Cádiz
Duration
25 days
Vision of the Seas underwent a major Royal Advantage refurbishment in October 2013. New dining venues included Park Café, Chef's Table, Chops Grille, Izumi and Giovanni's Table. The project also added R Bar, Diamond and Concierge lounges, Royal Babies and Tots Nursery, aerial Centrum entertainment, a poolside movie screen, digital wayfinding and shipwide Wi-Fi. Passenger cabin amenities were upgraded with flat-screen televisions and tablet technology.
Back
Top