• Register Now for a Free Account!
    Unlock additional site access with your free account today, takes less than a minute, and guaranteed no spam - ever. Register Now!

Cruising Earth

Royal Caribbean International Dry Dock Schedule

Royal Caribbean International Dry Dock Schedule 2026-2029

Royal Caribbean Dry Dock Schedule 2026-2029

Royal Caribbean International - Dry Dock

The Royal Caribbean International's Dry Dock Schedule includes all current Royal Caribbean ships, with details on upcoming scheduled dry docks as well as those recently completed. Cruise lines typically plan routine dry docks up to two years in advance to minimize the need to cancel or modify itineraries after bookings open. However, schedule changes are not uncommon. Unplanned events, such as significant mechanical issues, can require adjustments to the schedule, often creating a cascading effect, resulting in itinerary changes or even cancellations for two or more ships.

While sailing on a freshly refurbished ship straight out of dry dock can be a wonderful experience, a last-minute cruise cancellation due to an extended dry dock period can be deeply disappointing. We recommend keeping this possibility in mind when planning your cruise.

The information provided on this page is subject to change at any time. Report any inaccuracies or needed updates in our Royal Caribbean International Community Forum.

Dry Dock Schedule Last Updated: Thu Oct 08, 2026

Quick Jump to Ship

Adventure of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
November 8, 2024 - November 22, 2024
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
15 days
Adventure of the Seas underwent a scheduled dry dock at Navantia Cádiz that combined class inspections and technical maintenance with refurbishment of passenger accommodations and public areas. Work included repainting, replacement of carpeting in numerous areas, refreshed furnishings, cabin door-lock upgrades, new sound systems in the Royal Promenade and Windjammer, work on pools and hot tubs, and other hotel and guest-area improvements. New passenger accommodations were also added in space previously used for meeting facilities. Severe weather and flooding in Cádiz disrupted the project and delayed completion by two days, with some finishing work continuing after the ship returned to service.
Previous Dry Dock
January 31, 2018 - March 1, 2018
Shipyard
Grand Bahama Shipyard
Duration
30 days
Adventure of the Seas underwent a 30-day refurbishment at Grand Bahama Shipyard to complete major elements of the ship’s $61 million modernization that had been deferred following Hurricane Matthew during the 2016 dry dock. Work included the addition of new interior and ocean-view staterooms, Izumi Japanese Cuisine and a dedicated Suite Lounge, together with refurbishment of existing accommodations and completion of other outstanding modernization work.
Previous Dry Dock
October 17, 2016 - November 13, 2016
Shipyard
Grand Bahama Shipyard
Duration
28 days
Adventure of the Seas underwent the first phase of a planned $61 million revitalization at Grand Bahama Shipyard. Major additions included The Perfect Storm’s Cyclone and Typhoon racer waterslides, a FlowRider surf simulator, Splashaway Bay children’s aqua park and a redesigned two-level miniature golf course. The project also included passenger-area improvements and substantial technical modernization, including replacement of propulsion drive controls and installation of new propulsion control panels. Hurricane Matthew severely affected Freeport immediately before the dry dock and disrupted the project, preventing several planned enhancements from being completed. The unfinished work was subsequently completed during a second major refurbishment in 2018.
Previous Dry Dock
March 30, 2014 - April 7, 2014
Shipyard
Grand Bahama Shipyard
Duration
9 days
Adventure of the Seas underwent a nine-day scheduled dry dock in Freeport as part of Royal Caribbean’s fleetwide Royal Advantage program. Passenger-facing improvements included Giovanni’s Table, an outdoor poolside movie screen, shipwide Wi-Fi, digital signage, flat-screen and interactive televisions, an updated Vintages wine bar and new Concierge and Diamond lounges. Technical work included scheduled maintenance and repairs to the ship’s propulsion system following problems with a Fixipod immediately before the dry dock.

Allure of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
February 2025 - April 2025
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Allure of the Seas underwent an extended Royal Amplified modernization at Navantia Cádiz from February through April 2025. Representing an investment of more than $100 million, the project combined scheduled technical and hotel work with extensive passenger-area modernization. The pool deck was completely reimagined with resort-style pools, additional seating and shade, casitas, The Perfect Storm waterslides, Splashaway Bay, The Lime & Coconut and El Loco Fresh. New or reworked dining, bar and entertainment venues included Pesky Parrot, Playmakers Sports Bar & Arcade and The Mason Jar Southern Restaurant & Bar, while the Ultimate Abyss and a new Royal Escape Room added additional attractions. The project also included expanded accommodations and broad refurbishment throughout the ship.
Previous Dry Dock
May 25, 2020 - July 10, 2020
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
47 days
Allure of the Seas underwent a reduced technical shipyard project after the COVID-19 pandemic halted its planned $165 million Royal Amplified transformation. Work was conducted in two phases, May 25-30 and June 22-July 10. The reduced project concentrated on navigation and propulsion machinery, hull cleaning and painting, regulatory maintenance and servicing of lifeboats, release gear and winches. The extensive passenger-area modernization was deferred.
Previous Dry Dock
May 3, 2015 - May 17, 2015
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
15 days
Allure of the Seas underwent a major refurbishment that included painting, steel work, anchor and chain servicing and machinery maintenance. Passenger-area work included extensive dining changes, new and reconfigured suites and accommodations, updated retail and public spaces and refurbishment across 28 areas on 16 decks.

Anthem of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
March 22, 2025 - April 12, 2025
Shipyard
Seatrium Tuas Boulevard Yard
Location
Singapore
Duration
22 days
Anthem of the Seas underwent a scheduled dry dock at Seatrium's Tuas Boulevard facility in Singapore in March and April 2025. The project covered routine maintenance, safety and classification inspections, technical work, machinery overhaul, hull cleaning and repainting, and general hotel upkeep.
Previous Dry Dock
July 24, 2020 - August 12, 2020
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
20 days
Anthem of the Seas underwent a technical dry dock that included replacement of Azipod horizontal bearings, removal and reinstallation of the North Star gondola for bearing work, hull cleaning and paint repairs, inspection of bottom valves, four bow thrusters and stabilizers and load testing of lifeboats, tenders and davits.

Brilliance of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
April 21, 2025 - May 16, 2025
Shipyard
Chantier Naval de Marseille
Duration
26 days
Brilliance of the Seas completed a scheduled dry dock at Chantier Naval de Marseille from April 21 through May 16, 2025. The project covered routine maintenance, classification and safety inspections, technical work, machinery and system servicing, and hull cleaning and repainting.
Previous Dry Dock
2018
Shipyard
Blohm+Voss
Location
Hamburg, Germany
Brilliance of the Seas completed a scheduled dry dock in 2018. The historical record confirms the shipyard period, while a detailed authoritative work scope was not retained for this backfill.
Previous Dry Dock
April 24, 2013 - May 14, 2013
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
21 days
Brilliance of the Seas underwent a $30 million, three-week revitalization. New venues included Park Café, Chef's Table, Giovanni's Table, Izumi, Rita's Cantina, Vintages, R Bar, Diamond Club and Royal Babies and Tots Nursery. The Centrum was reworked for aerial entertainment, a poolside movie screen was installed, staterooms received flat-screen televisions and carpeting and soft furnishings were renewed throughout the ship.

Enchantment of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
May 22, 2024 - June 15, 2024
Shipyard
Grand Bahama Shipyard
Duration
25 days
Enchantment of the Seas underwent a scheduled dry dock at Grand Bahama Shipyard in Freeport between its May-June 2024 passenger programs. The project was primarily a maintenance and refresh dry dock rather than a major fleet modernization. Work focused on scheduled technical and marine maintenance, regulatory and classification requirements, underwater-hull servicing and general upkeep, along with cleaning, painting, repairs and refurbishment of passenger accommodations and public areas. The ship returned to passenger service in June without a publicly announced major venue conversion or new attraction.
Previous Dry Dock
September 27, 2021 - October 29, 2021
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
33 days
Enchantment of the Seas underwent an extensive scheduled maintenance dry dock at Navantia in Cádiz, Spain. Work included substantial steel repairs, maintenance of the propeller shaft lines, rudders, steering gear, stabilizers and thrusters, along with hydroblasting and hull painting. The ship was moved between Navantia's Cádiz and Puerto Real facilities during the project, with significant steel and marine work performed at Puerto Real.
Previous Dry Dock
December 1, 2012 - December 14, 2012
Shipyard
Grand Bahama Shipyard
Duration
14 days
Enchantment of the Seas received a Royal Advantage revitalization introducing Park Café in the Solarium, the retro-themed R Bar in the Centrum, Chef's Table dining, Diamond and Concierge lounges and Royal Babies and Tots Nursery. Passenger upgrades included a large outdoor poolside movie screen, digital Wayfinder navigation displays, enhanced shipwide Wi-Fi and new flat-screen stateroom televisions.
Previous Dry Dock
May 15, 2005 - June 23, 2005
Shipyard
Keppel Verolme Shipyard
Duration
40 days
Enchantment of the Seas underwent an approximately $55 million lengthening at Keppel Verolme in Rotterdam. The ship was cut in two and a prefabricated 73-foot midsection inserted, adding 151 staterooms and increasing passenger capacity. The enlarged pool deck gained two 75-foot suspension bridges connecting overhanging platforms, including an island bar with glass viewing panels in the floor. Four bungee trampolines were installed above the bow, while the new Splash Deck featured interactive water jets that became an illuminated fountain at night. The project also introduced Boleros Latin Lounge, expanded dining and youth facilities and extensive interior renovations.

Explorer of the Seas Dry Dock Schedule

Recently Completed Dry Dock
September 22, 2025 - October 19, 2025
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
28 days
Explorer of the Seas underwent a scheduled dry dock for comprehensive maintenance, hull inspection, propulsion-system servicing, classification work and improvements to passenger accommodations and hotel areas.

Previous Dry Docks

Previous Dry Dock
January 29, 2023 - March 12, 2023
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
43 days
Explorer of the Seas underwent scheduled technical maintenance, inspections, hotel work, hull cleaning and painting and general refurbishment. Passenger-facing work included installation of The Perfect Storm's Cyclone and Typhoon racer waterslides, completing a major attraction that had been planned as part of the ship's cancelled Royal Amplified modernization.
Previous Dry Dock
August 24, 2020 - September 17, 2020
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
25 days
Explorer of the Seas underwent a technical maintenance dry dock during the COVID-19 operational shutdown. The project concentrated on required technical maintenance, class work, inspections and general upkeep rather than the $110 million Royal Amplified transformation originally scheduled for the ship.
Previous Dry Dock
April 6, 2018 - April 20, 2018
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
15 days
Explorer of the Seas underwent a refurbishment that included renovation of passenger staterooms and conversion of the former aft Outdoor Youth Area on Deck 12 into Splashaway Bay, an interactive children's water park with slides, water cannons, fountains and geysers.
Previous Dry Dock
March 21, 2015 - April 1, 2015
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
12 days
Explorer of the Seas underwent a major revitalization that added numerous interior and ocean-view staterooms in former nightclub, gallery and service spaces. New venues and features included Giovanni's Table, Chops Grille, The Tavern, R Bar, Izumi, FlowRider, Royal Babies and Tots Nursery, Diamond Club and a poolside movie screen. Shipwide Wi-Fi, digital wayfinding and flat-screen stateroom televisions were also installed.

Freedom of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
January 16, 2025 - February 8, 2025
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
24 days
Freedom of the Seas underwent a scheduled maintenance and class dry dock at Navantia Cádiz in Spain. Work included technical maintenance and updates, classification inspections, general hotel upkeep, and renewal of carpets, upholstery and tilework. The Deck 5 Vintages wine bar was also converted into Casino Royale Non-Smoking, providing a separate non-smoking casino. The project was primarily a maintenance dry dock rather than a major Royal Amplified refurbishment.
Previous Dry Dock
2020
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Freedom of the Seas underwent an approximately $116 million Royal Amplified modernization in early 2020. The extensive project introduced a redesigned Caribbean-style pool deck, Splashaway Bay, The Lime & Coconut and The Perfect Storm waterslides. Dining and entertainment additions included Giovanni's Italian Kitchen, El Loco Fresh, Izumi Hibachi & Sushi and Playmakers Sports Bar & Arcade. Adventure Ocean and teen spaces were also redesigned, with broader passenger-area, hotel and technical work completed throughout the ship.
Previous Dry Dock
January 12, 2015 - February 4, 2015
Shipyard
Grand Bahama Shipyard
Duration
24 days
Freedom of the Seas underwent a 24-day bow-to-stern refurbishment. Furnishings throughout the ship were renewed and 67 new staterooms were added, including panoramic ocean-view accommodations. New and updated venues included Sabor Modern Mexican, Giovanni's Table, Chops Grille, R Bar, Royal Babies and Tots Nursery, a 3D cinema and a large poolside movie screen.

Grandeur of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
March 24, 2024 - April 24, 2024
Shipyard
Grand Bahama Shipyard
Duration
32 days
Grandeur of the Seas completed a scheduled dry dock at Grand Bahama Shipyard from March 24 through April 24, 2024. The project focused on routine maintenance, classification work, machinery upgrades and safety inspections. Hotel updates included new carpeting and upholstery throughout public areas.
Previous Dry Dock
May 7, 2012 - June 10, 2012
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
35 days
Grandeur of the Seas underwent a five-week, $48 million Royal Advantage revitalization. Passenger accommodations and bathrooms were refurbished and new venues included Park Café, Chef's Table, Chops Grille, Giovanni's Table, Izumi, R Bar, Diamond and Concierge lounges and Royal Babies and Tots Nursery. The project also introduced aerial Centrum entertainment, a poolside movie screen, shipwide Wi-Fi and upgraded passenger technology.

Harmony of the Seas Dry Dock Schedule

Recently Completed Dry Dock
April 3, 2026 - May 21, 2026
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
49 days
Harmony of the Seas completed an approximately seven-week Royal Amplified dry dock at Navantia Cádiz from April 3 through May 21, 2026. The project combined technical maintenance with extensive passenger-area modernization, including a Caribbean-inspired pool deck with The Lime & Coconut and a refreshed adults-only Solarium. New dining and entertainment options included Playmakers Sports Bar & Arcade, El Loco Fresh and Samba Grill. The project also introduced new accommodations including the Ultimate Family Suite, expanded and refreshed hotel areas throughout the ship, and transformed Casino Royale into the largest casino in Royal Caribbean's fleet.

Previous Dry Docks

Previous Dry Dock
March 31, 2021 - May 1, 2021
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
32 days
Harmony of the Seas underwent its first scheduled technical dry dock. Work concentrated on propellers, stabilizers, bottom valves, hull and exterior painting, classification requirements and routine technical maintenance. The previously planned Royal Amplified passenger-area modernization was not performed.

Independence of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
January 16, 2023 - February 7, 2023
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
23 days
Independence of the Seas underwent a scheduled dry dock at Navantia Cádiz for classification work, technical maintenance and hotel refurbishment. Work included inspection and servicing of propulsion and other machinery systems, hull and underwater maintenance, safety and regulatory work, steel and general repair work, and maintenance of passenger accommodations and public areas. Hotel work included replacement and repair of worn finishes, carpeting, furnishings and other interior components, together with minor upgrades throughout the ship. The project was primarily a comprehensive maintenance and refurbishment period rather than another major Royal Amplified modernization.
Previous Dry Dock
2018
Shipyard
Grand Bahama Shipyard
Independence of the Seas underwent an approximately 30-day, $110 million modernization in 2018 as part of Royal Caribbean's Royal Amplified program. Major additions included Sky Pad, The Perfect Storm waterslides, glow-in-the-dark laser tag and an escape-room experience. New and reworked dining and entertainment venues included Playmakers Sports Bar & Arcade, Fish & Ships, Izumi Hibachi & Sushi and Sugar Beach, with extensive additional passenger-area refurbishment completed throughout the ship.
Previous Dry Dock
April 22, 2013 - May 1, 2013
Shipyard
Blohm+Voss
Location
Hamburg, Germany
Duration
10 days
Independence of the Seas underwent an approximately $7 million refurbishment at Navantia Cádiz in April 2013. The project added Giovanni's Table, Cupcake Cupboard, Royal Babies and Tots Nursery, digital wayfinding displays, shipwide Wi-Fi and a large poolside movie screen.

Jewel of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
April 22, 2024 - May 13, 2024
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
22 days
Jewel of the Seas underwent a scheduled 20-year maintenance and refurbishment dry dock at Damen Shiprepair Brest in France. The project included overhauls of the Azipod propulsion system, bow thrusters and stabilizers, electrical-system work, classification inspections and general technical and hotel maintenance. The hull and superstructure were completely repainted, and exterior windows were replaced.
Previous Dry Dock
May 3, 2021 - May 17, 2021
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
15 days
Jewel of the Seas underwent a scheduled five-year regulatory dry dock at Navantia Cádiz in Spain. Work included maintenance of the propulsion, stabilization and maneuvering systems, inspection of underwater components, high-pressure hull cleaning and application of a new exterior hull coating system. Minor structural renewal, deck and accommodation work was also completed as part of the required inspection and maintenance program.
Previous Dry Dock
April 3, 2016 - April 23, 2016
Shipyard
Grand Bahama Shipyard
Duration
21 days
Jewel of the Seas underwent a major revitalization at Grand Bahama Shipyard in Freeport. Passenger-area improvements included the addition of Izumi, Giovanni's Table, Vintages wine bar, Royal Babies & Tots Nursery, an outdoor movie screen, shipwide VOOM internet and digital signage, along with new and refurbished passenger accommodations and updates to Chops Grille, the spa and retail areas. Technical work included Azipod overhauls, major tank conversions, general repairs and installation of an exhaust-gas scrubber system.

Liberty of the Seas Dry Dock Schedule

Recently Completed Dry Dock
Spring 2026
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
Approximately five weeks
Liberty of the Seas completed an approximately five-week Royal Amplified dry dock at Damen Shiprepair Brest in spring 2026. In addition to routine technical maintenance and refurbishment, the project introduced a completely reimagined pool deck with The Lime & Coconut and private casitas, along with a new Royal Escape Room. Dining additions included Izumi Teppanyaki and El Loco Fresh, while Starbucks was added and Casino Royale was expanded.

Previous Dry Docks

Previous Dry Dock
2021
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Liberty of the Seas completed a scheduled dry dock in 2021. The period covered technical maintenance and general refurbishment before the ship returned to service.
Previous Dry Dock
January 23, 2011 - January 29, 2011
Shipyard
Grand Bahama Shipyard
Duration
7 days
Liberty of the Seas underwent its first major refurbishment. The project introduced Royal Babies and Tots Nursery, Cupcake Cupboard, a large poolside movie screen and BRITTO Art Gallery, upgraded Vintages and added entertainment enhancements including 3D movies, the DreamWorks Experience and the Broadway production Saturday Night Fever. The ship resumed passenger service from Miami on January 30.

Mariner of the Seas Dry Dock Schedule

Recently Completed Dry Dock
February 17, 2026 - March 16, 2026
Shipyard
Grand Bahama Shipyard
Duration
28 days
Mariner of the Seas underwent a scheduled maintenance and refurbishment dry dock at Grand Bahama Shipyard in Freeport. The project focused on technical maintenance and general refreshing rather than a major Royal Amplified modernization. Passenger-facing improvements included new private casitas on the pool deck, upgraded sound systems, RFID Wow Band capability, refreshed finishes and minor stateroom updates including new thermostats and motion-activated closet lighting in some cabins.

Previous Dry Docks

Previous Dry Dock
February 28, 2023 - March 25, 2023
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
26 days
Mariner of the Seas completed a scheduled dry dock at Navantia Cádiz from February 28 through March 25, 2023. Work included routine maintenance, classification inspections, general hotel upkeep, minor steel repairs, aft-hull cleaning and painting, and propulsion and azipod overhauls. The Sky Pad attraction was removed and its platform was converted into an open activity area for outdoor games and programs.
Previous Dry Dock
2018
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Mariner of the Seas underwent an approximately $120 million modernization in 2018 that substantially transformed the ship for its new short-cruise deployment. Major additions included Sky Pad, The Perfect Storm racer waterslides, glow-in-the-dark laser tag and Escape Room: The Observatorium. The project also introduced The Bamboo Room, Playmakers Sports Bar & Arcade and additional dining and entertainment experiences, together with new accommodations and extensive refurbishment of existing passenger areas.
Previous Dry Dock
April 21, 2012 - May 1, 2012
Shipyard
Seatrium Admiralty Yard
Location
Singapore
Duration
11 days
Mariner of the Seas underwent a Royal Advantage refurbishment that added Giovanni's Table, Boardwalk Dog House, Royal Babies and Tots Nursery, Diamond Club and a large poolside movie screen. All staterooms received flat-screen televisions, while shipwide Wi-Fi and digital wayfinding were introduced. The casino, Vintages and Royal Promenade retail areas were also upgraded.

Oasis of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
September 29, 2024 - October 24, 2024
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
26 days
Oasis of the Seas completed a scheduled dry dock at Navantia Cádiz from September 29 through October 24, 2024. The period covered routine maintenance, technical and classification work, hull work and general upkeep following the ship's extensive 2019 Royal Amplified modernization.
Previous Dry Dock
2019
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Oasis of the Seas underwent a 63-day, approximately $165 million Royal Amplified modernization in 2019. The extensive project reimagined the pool deck and added Splashaway Bay, The Lime & Coconut and The Perfect Storm waterslides, while the Ultimate Abyss added a major new attraction at the stern. New and reworked dining, beverage and entertainment venues included Music Hall, Portside BBQ, Playmakers Sports Bar & Arcade, El Loco Fresh, Sugar Beach and Spotlight Karaoke. The project also included broad refurbishment of accommodations, public areas and technical systems throughout the ship.
Previous Dry Dock
September 30, 2014 - October 14, 2014
Shipyard
Keppel Verolme Shipyard
Duration
15 days
Oasis of the Seas completed a broad passenger-area refurbishment in September-October 2014. Dining-room levels were converted to American Icon Grill and Silk, Izumi and Diamond Club replaced private dining rooms, and Sabor replaced Seafood Shack. Boardwalk dining and retail were reworked, new interior staterooms were added on several decks and additional accommodations were created near Central Park and Dazzles.

Odyssey of the Seas Dry Dock Schedule

Recently Completed Dry Dock
March 30, 2026 - April 15, 2026
Shipyard
Chantier Naval de Marseille
Duration
17 days
Odyssey of the Seas completed its first scheduled dry dock in France in April 2026 before beginning its Mediterranean season. The project was a routine maintenance period rather than a Royal Amplified transformation.

Reported work included scheduled technical maintenance, machinery and safety inspections, hull work and general hotel upkeep, with updates to public areas and staterooms. No major new venues or extensive passenger-facing modifications were announced. The ship returned to passenger service from Barcelona in mid-April 2026.

Ovation of the Seas Dry Dock Schedule

Recently Completed Dry Dock
Spring 2026
Shipyard
Seatrium Tuas Boulevard Yard
Location
Singapore
Ovation of the Seas underwent a Royal Amplified modernization at Seatrium Tuas Boulevard in Singapore in spring 2026, combining technical maintenance with substantial passenger-area refurbishment. The project included a completely revamped pool deck with private casitas and a new whirlpool. New and reworked venues included Giovanni's Italian Kitchen, Izumi Teppanyaki, the Pesky Parrot tiki bar and Sound Cellar, while Casino Royale was expanded. New accommodation categories included the Ultimate Family Suite and Panoramic Suite before the ship returned to service.

Quantum of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
October 28, 2024 - November 18, 2024
Shipyard
Seatrium Tuas Boulevard Yard
Location
Singapore
Duration
22 days
Quantum of the Seas underwent a scheduled maintenance and refurbishment dry dock at Seatrium in Singapore. Work included machinery overhauls, safety inspections, routine technical and hotel maintenance, hull blast cleaning and repainting, and marine glazing refurbishment. The ship's North Star observation capsule was also restored to operation. The project was primarily a scheduled maintenance dry dock rather than a major Royal Amplified modernization.
Previous Dry Dock
October 19, 2019 - November 16, 2019
Shipyard
Seatrium Tuas Boulevard Yard
Location
Singapore
Duration
29 days
Quantum of the Seas underwent its first scheduled five-year dry dock and revitalization at Sembcorp Marine's Tuas Boulevard Yard in Singapore. The approximately $65 million project included major technical overhauls, class and regulatory work, interior refurbishment, and engineering work involving hull systems, piping and naval architecture. Passenger-facing additions included new Laser Tag and Escape Room experiences.

Radiance of the Seas Dry Dock Schedule

Recently Completed Dry Dock
January 20, 2026 - February 13, 2026
Shipyard
Grand Bahama Shipyard
Duration
25 days
Radiance of the Seas completed a 25-day scheduled dry dock at Grand Bahama Shipyard from January 20 through February 13, 2026. The project included hull inspection, routine technical maintenance, class work and general refurbishment, along with minor passenger-area refreshing including upholstery updates before the ship returned to service.

Previous Dry Docks

Previous Dry Dock
March 10, 2024 - March 24, 2024
Shipyard
Grand Bahama Shipyard
Duration
15 days
Radiance of the Seas underwent a scheduled maintenance dry dock at Grand Bahama Shipyard in Freeport. The project included general technical maintenance and equipment overhauls, classification work and hotel upkeep. Passenger-area refurbishment included replacement of carpeting and upholstery throughout public areas, along with exterior hull repainting and general refreshing.
Previous Dry Dock
August 23, 2021 - October 7, 2021
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
46 days
Radiance of the Seas underwent an extended technical dry dock during the cruise-industry shutdown and restart period. Work concentrated on classification requirements, machinery and marine maintenance, technical inspections, hull servicing and general ship upkeep rather than a major passenger-area transformation.
Previous Dry Dock
May 2, 2016 - May 13, 2016
Shipyard
Vigor Shipyard
Location
Portland, Oregon
Duration
12 days
Radiance of the Seas underwent a 12-day shipyard period that included steel replacement, propulsion and propeller maintenance and other technical servicing. Passenger cabins were refurbished, the Vitality at Sea spa complex was redesigned and the outdoor pool-deck area was refreshed.
Previous Dry Dock
May 24, 2011 - June 14, 2011
Shipyard
Seaspan Victoria Shipyards
Duration
22 days
Radiance of the Seas underwent an approximately $20 million, 22-day revitalization. Eight new dining venues were introduced, including Izumi and Samba Grill, passenger accommodations were enhanced and additional staterooms were created. The project also added Royal Babies and Tots Nursery, a poolside LED movie screen, shipwide Wi-Fi, interactive stateroom televisions and digital wayfinding.

Rhapsody of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
May 1, 2025 - May 15, 2025
Shipyard
Grand Bahama Shipyard
Duration
15 days
Rhapsody of the Seas underwent a scheduled maintenance dry dock at Grand Bahama Shipyard in Freeport. The project included general technical and classification work along with hotel maintenance and refurbishment of public areas and passenger cabins. Passenger-area work included replacement of carpeting, upholstery and furniture and general interior refreshing.
Previous Dry Dock
April 14, 2022 - May 7, 2022
Shipyard
Damen Shiprepair Brest
Location
Brest, France
Duration
24 days
Rhapsody of the Seas completed a scheduled dry dock at Damen Shiprepair Brest from April 14 through May 7, 2022. Work included hull cleaning and painting, machinery, propulsion and engine inspections and upgrades, renovation of sundeck and swimming-pool areas, and recarpeting of indoor public areas including hallways, bars and lounges.
Previous Dry Dock
November 19, 2016 - December 7, 2016
Shipyard
Grand Bahama Shipyard
Duration
19 days
Rhapsody of the Seas underwent a scheduled dry dock for classification work, machinery and technical maintenance, hull servicing and general hotel refurbishment before returning to passenger service. The project was primarily a maintenance and refresh period rather than a major fleetwide-style revitalization.
Previous Dry Dock
March 1, 2012 - March 28, 2012
Shipyard
Seatrium Admiralty Yard
Location
Singapore
Duration
28 days
Rhapsody of the Seas underwent an approximately $16 million Royal Advantage refurbishment in March 2012. All staterooms received updated interiors, furniture, linens, bathrooms and televisions. New venues included Giovanni's Table, Izumi, Chops Grille, Chef's Table, Park Café, R Bar, Diamond and Concierge lounges and Royal Babies and Tots Nursery. A poolside movie screen, aerial entertainment in the Centrum, shipwide Wi-Fi and digital wayfinding were also added.

Serenade of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
March 2025
Shipyard
Grand Bahama Shipyard
Serenade of the Seas completed a scheduled dry dock in March 2025. The period covered routine technical maintenance and general passenger-area refresh work.
Previous Dry Dock
March 4, 2022 - April 11, 2022
Shipyard
Grand Bahama Shipyard
Duration
39 days
Serenade of the Seas underwent an extended scheduled maintenance and refurbishment dry dock at Grand Bahama Shipyard in Freeport. Work included hull cleaning and painting, mechanical and machinery inspections and upgrades, refurbishment of outdoor deck and swimming-pool areas, and replacement of carpeting throughout indoor public spaces including hallways, bars and lounges.
Previous Dry Dock
November 19, 2012 - December 9, 2012
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
21 days
Serenade of the Seas underwent a major Royal Advantage refurbishment in November-Decmeber 2012. Staterooms received upgraded televisions, bathroom improvements and refreshed finishes. New passenger venues included Giovanni's Table, Izumi, Rita's Cantina, Chef's Table, Diamond and Concierge lounges and a poolside movie screen, together with broader dining and public-area updates.

Symphony of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
March 22, 2023 - April 13, 2023
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
23 days
Symphony of the Seas underwent a scheduled dry dock at Navantia Cádiz from March 22 through April 13, 2023. The project included routine maintenance, technical upgrades, minor steel work, underwater-hull cleaning and painting, and hotel and public-area refreshing. Jazz on 4 was converted into a non-smoking casino room.
Previous Dry Dock
May 20, 2021 - June 6, 2021
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
18 days
Symphony of the Seas entered its first dry dock at Navantia Cádiz on May 20, 2021. The approximately month-long technical project covered propellers, fin stabilizers, bottom valves, hull painting, routine maintenance and classification and regulatory inspections while the ship was out of passenger service.

Vision of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
April 20, 2024 - May 24, 2024
Shipyard
Grand Bahama Shipyard
Duration
35 days
Vision of the Seas completed a scheduled dry dock at Grand Bahama Shipyard from April 20 through May 24, 2024. The project covered routine maintenance, classification and safety inspections, technical overhaul, hotel upkeep and updates to selected public areas.
Previous Dry Dock
February 4, 2022 - February 24, 2022
Shipyard
Grand Bahama Shipyard
Duration
21 days
Vision of the Seas underwent a 27-day scheduled dry dock at Grand Bahama Shipyard while the ship remained out of passenger service during the COVID-19 operational pause. The project was a technical maintenance and classification dry dock rather than a major refurbishment, covering required class work, inspections, machinery and marine-system maintenance, underwater-hull work and general ship upkeep.
Previous Dry Dock
November 10, 2018 - November 24, 2018
Shipyard
Grand Bahama Shipyard
Duration
15 days
Vision of the Seas underwent a scheduled maintenance dry dock focused primarily on technical servicing, classification work, hull maintenance and general shipboard upkeep rather than a major passenger-area modernization. Contemporary post-drydock reporting specifically describes the November yard period as maintenance rather than refurbishment.
Previous Dry Dock
September 29, 2013 - October 23, 2013
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
25 days
Vision of the Seas underwent a major Royal Advantage refurbishment in October 2013. New dining venues included Park Café, Chef's Table, Chops Grille, Izumi and Giovanni's Table. The project also added R Bar, Diamond and Concierge lounges, Royal Babies and Tots Nursery, aerial Centrum entertainment, a poolside movie screen, digital wayfinding and shipwide Wi-Fi. Passenger cabin amenities were upgraded with flat-screen televisions and tablet technology.

Voyager of the Seas Dry Dock Schedule

Previous Dry Docks

Previous Dry Dock
October 24, 2024 - December 8, 2024
Shipyard
Navantia Cádiz
Location
Cádiz, Spain
Duration
46 days
Voyager of the Seas underwent an extended scheduled dry dock at Navantia Cádiz from October 24 through December 8, 2024. The project included routine maintenance and classification work, machinery and system overhauls, hull cleaning and repainting, and minor renovation of public spaces and facilities.
Previous Dry Dock
September 10, 2019 - October 20, 2019
Shipyard
Seatrium Tuas Boulevard Yard
Location
Singapore
Duration
41 days
Voyager of the Seas underwent an approximately $97 million Royal Amplified modernization in 2019. The project introduced The Perfect Storm racer waterslides, revitalized Vitality Spa and substantially redesigned children's and teen spaces. Seventy-two additional staterooms were added, together with broader passenger-area, hotel and technical improvements, before the ship returned to service from Singapore in October 2019.
Previous Dry Dock
October 17, 2014 - November 17, 2014
Shipyard
Seatrium Tuas Boulevard Yard
Location
Singapore
Duration
32 days
Voyager of the Seas underwent a major approximately $80 million refurbishment at the Sembcorp Marine Integrated Yard at Tuas in Singapore. New interior and ocean-view accommodations were created from portions of former nightclub, gallery and service spaces, while selected interior staterooms received Virtual Balconies. The project added the FlowRider surf simulator, Chops Grille, Izumi, Diamond Club, Royal Babies and Tots Nursery, spa-category accommodations and a large poolside movie screen. Stateroom televisions, digital wayfinding, shipwide Wi-Fi and other passenger technology were upgraded, while carpeting, finishes and other public areas were extensively renewed. Technical work included Azipod maintenance and modifications, servicing of thrusters and stabilizers, hull inspection and painting and other scheduled marine maintenance.

Plan with Confidence

Every cruise is different, and successful trip planning often means researching more than one topic. Explore additional Cruising Earth travel planning resources for information on cruise lines, cabins, dining, beverage packages, gratuities, ports of call, packing, budgeting, weather, and more. If you have questions, would like to share your experiences, or have information that could help improve these guides, we invite you to join the discussion in our Community Forums.

Back
Top