• Register Now for a Free Account!
    Unlock additional site access with your free account today, takes less than a minute, and guaranteed no spam - ever. Register Now!

Cruising Earth

Norwegian Breakaway Cruise Ship Tracker

Norwegian Breakaway Real-Time Cruise Ship Tracking

Norwegian Breakaway Cruise Ship Tracking Map

Loading tracking map...
Loading tracking map...
Tracking Map Legend:
  • Cargo
  • Tanker
  • Cruise / Passenger
  • High Speed
  • Military / Special
  • Fishing
  • Pleasure
  • Unknown

Norwegian Breakaway Cruise Ship Details

In Service:2013 | 13 years
Last Refurb:NA
Class:Breakaway
Builder:Meyer Werft
Build Location:Papenburg, Germany
Call Sign:C6ZJ3
Flagged Country:Bahamas
Passengers:4,500
Crew:1,600
Gross Tons:144,017 GT
Length: 1,063.0 ft
Beam: 130.2 ft
Draft: 27.0 ft
Speed: 21.5 knots / 24.7 mph
Staterooms:1,604

The Breakaway class cruise ships were built between 2013 and 2018 for Norwegian Cruise Line, Aroya Cruises, and Dream Cruises. They introduced the first Waterfront outdoor promenade on a large cruise ship along with a multi-level Aqua Park. The ships feature a go-kart track, laser tag arena, and the 10-story Ultimate Abyss dry slide. The class includes a distinctive split-superstructure design that maximizes open deck space and was the first to include a rock-climbing wall and zip line at sea.

Norwegian Breakaway Dry Dock History

Previous Dry Dock
February 19, 2025 - March 14, 2025
Shipyard
Damen Shiprepair Brest
Duration
Approximately three weeks
Norwegian Breakaway completed a shipyard refurbishment at Damen Shiprepair Brest from February 19 through March 14, 2025, combining scheduled technical maintenance with substantial passenger-area improvements. The project introduced the Silver Screen Bistro cinema-and-dining venue, Horizon Park and The Stadium. Cagney's Steakhouse was expanded, Ocean Blue was converted to Palomar, and Vibe Beach Club and The Haven Sundeck received expanded seating and cabanas before the ship returned to service.
Previous Dry Dock
April 28, 2018 - May 8, 2018
Shipyard
Damen Shiprepair Brest
Duration
11 days
Norwegian Breakaway completed a scheduled dry dock and refurbishment at Damen Shiprepair Brest. Work included repairs to shaft bearings and replacement of slewing seals on both ABB Azipods, removal and servicing of both propellers, maintenance of the three bow thrusters and two stabilizers, hull repainting, extensive replacement of interior carpeting, refreshed staterooms and public areas, and the introduction of Syd Norman’s Pour House.
Back
Top