• Register Now for a Free Account!
    Unlock additional site access with your free account today, takes less than a minute, and guaranteed no spam - ever. Register Now!

Cruising Earth

Celebrity Eclipse Cruise Ship Tracker

Celebrity Eclipse Real-Time Cruise Ship Tracking

Celebrity Eclipse Cruise Ship Tracking Map

Loading tracking map...
Loading tracking map...
Tracking Map Legend:
  • Cargo
  • Tanker
  • Cruise / Passenger
  • High Speed
  • Military / Special
  • Fishing
  • Pleasure
  • Unknown

Celebrity Eclipse Cruise Ship Details

Seasonal Routes: Alaskan, Antarctica, South America, Hawaii, Pacific Northwest and Asian
In Service:2010 | 16 years
Last Refurb:NA
Class:Solstice
Builder:Meyer Werft
Build Location:Papenburg, Germany
Cost:750 Million USD
Call Sign:9HXC9
Flagged Country:Malta
Passengers:2,852
Crew:1,271
Gross Tons:121,878 GT
Length: 1,040.5 ft
Beam: 120.8 ft
Draft: 27.3 ft
Speed: 24.0 knots / 27.6 mph
Staterooms:NA

The Solstice class cruise ships were built between 2008 and 2012 for Celebrity Cruises and introduced the first Lawn Club at sea with real grass and the innovative Lawn Club Grill. The ships feature a sleek design with extensive use of glass and open spaces along with multiple specialty restaurants by celebrity chefs. The class includes a large theater and extensive outdoor promenade areas. The vessels were designed for sophisticated cruising with culinary excellence.

Celebrity Eclipse Dry Dock History

Previous Dry Dock
March 22, 2025 - April 27, 2025
Shipyard
Damen Shiprepair Brest
Duration
36 days
Celebrity Eclipse underwent a scheduled dry dock at Damen Shiprepair Brest in April 2025. Celebrity confirmed that the yard operation ran later than planned, delaying the ship's subsequent Amsterdam departure from April 27 to April 28.

Reported passenger-area work included the addition of ten inside staterooms in spaces formerly occupied by facilities such as the internet café, technology shop, card room and video arcade. Carpeting, furniture and selected public areas were refreshed, and improvements were reported for The Retreat facilities. Routine maintenance, survey and technical work were also undertaken.
Back
Top