• Register Now for a Free Account!
    Unlock additional site access with your free account today, takes less than a minute, and guaranteed no spam - ever. Register Now!

Cruising Earth

Voyager of the Seas Cruise Ship Tracker

Voyager of the Seas Real-Time Cruise Ship Tracking

Voyager of the Seas Cruise Ship Tracking Map

Loading tracking map...
Loading tracking map...
Tracking Map Legend:
  • Cargo
  • Tanker
  • Cruise / Passenger
  • High Speed
  • Military / Special
  • Fishing
  • Pleasure
  • Unknown

Voyager of the Seas Cruise Ship Details

In Service:1999 | 27 years
Last Refurb:NA
Class:Voyager
Builder:Kvaener Masa-Yards
Build Location:finland
Cost:650 Million USD
Call Sign:C6SE5
Flagged Country:Bahamas
Passengers:3,138
Crew:1,181
Gross Tons:137,276 GT
Length: 1,020.0 ft
Beam: 127.0 ft
Draft: 29.0 ft
Speed: 23.7 knots / 27.3 mph
Staterooms:NA

The Voyager class cruise ships were built between 1999 and 2003 for Royal Caribbean International and introduced the revolutionary Royal Promenade and ice-skating rink at sea. The ships feature extensive entertainment options and family-friendly activities across multiple decks. The class was the first to include a rock-climbing wall and a full-size basketball court at sea. The vessels were designed with a distinctive split-superstructure layout.

Voyager of the Seas Dry Dock History

Previous Dry Dock
October 24, 2024 - December 8, 2024
Shipyard
Navantia Cádiz
Duration
46 days
Voyager of the Seas underwent an extended scheduled dry dock at Navantia Cádiz from October 24 through December 8, 2024. The project included routine maintenance and classification work, machinery and system overhauls, hull cleaning and repainting, and minor renovation of public spaces and facilities.
Previous Dry Dock
September 10, 2019 - October 20, 2019
Shipyard
Seatrium Tuas Boulevard Yard
Location
Singapore
Duration
41 days
Voyager of the Seas underwent an approximately $97 million Royal Amplified modernization in 2019. The project introduced The Perfect Storm racer waterslides, revitalized Vitality Spa and substantially redesigned children's and teen spaces. Seventy-two additional staterooms were added, together with broader passenger-area, hotel and technical improvements, before the ship returned to service from Singapore in October 2019.
Previous Dry Dock
October 17, 2014 - November 17, 2014
Shipyard
Seatrium Tuas Boulevard Yard
Location
Singapore
Duration
32 days
Voyager of the Seas underwent a major approximately $80 million refurbishment at the Sembcorp Marine Integrated Yard at Tuas in Singapore. New interior and ocean-view accommodations were created from portions of former nightclub, gallery and service spaces, while selected interior staterooms received Virtual Balconies. The project added the FlowRider surf simulator, Chops Grille, Izumi, Diamond Club, Royal Babies and Tots Nursery, spa-category accommodations and a large poolside movie screen. Stateroom televisions, digital wayfinding, shipwide Wi-Fi and other passenger technology were upgraded, while carpeting, finishes and other public areas were extensively renewed. Technical work included Azipod maintenance and modifications, servicing of thrusters and stabilizers, hull inspection and painting and other scheduled marine maintenance.
Back
Top