Previous Dry Dock
April 22, 2024 - May 13, 2024
Jewel of the Seas underwent a scheduled 20-year maintenance and refurbishment dry dock at Damen Shiprepair Brest in France. The project included overhauls of the Azipod propulsion system, bow thrusters and stabilizers, electrical-system work, classification inspections and general technical and hotel maintenance. The hull and superstructure were completely repainted, and exterior windows were replaced.