Previous Dry Dock
April 9, 2025 - April 29, 2025
- Shipyard
- Fincantieri Palermo
- Duration
- 21 days
Emerald Princess completed a scheduled dry dock at Fincantieri Palermo in April 2025, arriving at the facility on April 9 and returning to passenger service on April 29. Industry reporting described the core scope as scheduled maintenance, class inspections and technical work.
Reported passenger-facing work included conversion of the Wheelhouse Bar into O'Malley's Irish Pub and Sports Bar, accessibility-related updates in cabins and public spaces, replacement carpeting and refurbishment of the buffet. Additional reported technical work included underwater-hull cleaning and painting, thruster and stabilizer overhauls, scrubber and steel work, and installation of air-lubrication and membrane-bioreactor systems. Some of this detailed scope is documented through secondary reporting rather than a comprehensive Princess post-dry-dock announcement.
Previous Dry Dock
October 12, 2022 - October 28, 2022
- Shipyard
- Damen Shiprepair Rotterdam (Botlek)
- Duration
- 17 days
Emerald Princess underwent routine dry docking at Damen Shiprepair Rotterdam frof October 12, 2022 to October 28, 2022. The project included scheduled maintenance, technical and classification work, safety inspections, and hull cleaning and repainting.
Previous Dry Dock
April 1, 2019 - April 14, 2019
- Shipyard
- Seaspan Victoria Shipyards
- Duration
- 14 days
Emerald Princess completed a two-week dry dock at Seaspan Victoria Shipyards from April 1 through April 14, 2019. The project combined routine maintenance and classification work with passenger-area refurbishment, including Princess Luxury Bed installation, refreshed décor in The Sanctuary and Camp Discovery, and creation of Planks BBQ and Steamers Seafood from part of the buffet area.
Previous Dry Dock
November 30, 2015 - December 13, 2015
- Shipyard
- Grand Bahama Shipyard
- Duration
- 14 days
Emerald Princess underwent a multimillion-pound refurbishment in Freeport from November 30 through December 13, 2015. SHARE by Curtis Stone replaced Sabatini's, and Salty Dog Gastropub was introduced in the Wheelhouse Bar. Passenger staterooms received Princess Luxury Beds, the fitness center gained new equipment and free weights, and approximately 100 staterooms were converted into connecting family accommodations.
Previous Dry Dock
December 7, 2012 - December 17, 2012
- Shipyard
- Grand Bahama Shipyard
- Duration
- 11 days
Emerald Princess underwent a scheduled dry-dock renovation from December 7 through December 17, 2012. The shipyard described the visit as a routine maintenance docking, with the work focused primarily on scheduled maintenance and technical upkeep rather than a major passenger-area refurbishment.