• Register Now for a Free Account!
    Unlock additional site access with your free account today, takes less than a minute, and guaranteed no spam - ever. Register Now!

Cruising Earth

Disney Magic Cruise Ship Tracker

Disney Magic Real-Time Cruise Ship Tracking

Disney Magic Cruise Ship Tracking Map

Loading tracking map...
Loading tracking map...
Tracking Map Legend:
  • Cargo
  • Tanker
  • Cruise / Passenger
  • High Speed
  • Military / Special
  • Fishing
  • Pleasure
  • Unknown

Disney Magic Cruise Ship Details

In Service:1998 | 28 years
Last Refurb:2013
Class:NA
Builder:Fincantieri
Build Location:Marghera Shipyard, Venice, Italy
Cost:400 Million USD
Call Sign:NA
Flagged Country:Bahamas
Passengers:2,400
Crew:946
Gross Tons:84,000 GT
Length: 984.0 ft
Beam: 106.0 ft
Draft: 25.3 ft
Speed: 21.5 knots / 24.7 mph
Staterooms:NA

Disney Magic Dry Dock History

Recently Completed Dry Dock
May 2, 2026 - May 16, 2026
Shipyard
Seaspan Victoria Shipyards
Duration
Two weeks
Disney Magic completed a scheduled two-week dry dock at Seaspan Victoria Shipyards in the federally owned Esquimalt Graving Dock. Reported work consisted of technical maintenance, routine upkeep and cosmetic refreshing ahead of the ship's inaugural Alaska season. No reliable public source documented a major redesign or named new passenger venue.
Previous Dry Dock
April 15, 2023 - May 4, 2023
Shipyard
Grand Bahama Shipyard
Duration
20 days
Disney Magic completed a three-week refurbishment at Grand Bahama Shipyard that introduced the new Soul Cat Lounge, inspired by Pixar's Soul, and the interactive An Encanto Celebration family experience. The Concierge Lounge was reimagined and expanded with a Moana-inspired design and additional covered outdoor seating, while all concierge suites, including the one- and two-bedroom accommodations and Royal Suites, were completely refurbished with new fixtures, furnishings and artwork. The project also installed shore-power capability, allowing the ship to connect to shoreside electricity where available, alongside scheduled maintenance and upkeep.
Previous Dry Dock
February 23, 2018 - March 8, 2018
Shipyard
Grand Bahama Shipyard
Duration
14 days
Disney Magic underwent a two-week dry dock refurbishment at Grand Bahama Shipyard in Freeport, introducing Rapunzel's Royal Table, a Tangled-themed rotational dining restaurant replacing Carioca's. The redesigned restaurant features a royal ballroom setting, illuminated lanterns, themed dining and live musical entertainment featuring Rapunzel and characters from the film. The Vibe teen club was transformed into an urban loft environment with a coffee and smoothie bar, video and virtual reality games, DJ activities and movie-making facilities. Cove Café received a tropical-inspired redesign, with matching improvements to the adjacent Signals Bar. Club Disney Junior was introduced within Disney's Oceaneer Club, while the Senses Spa Rainforest Room was completely renovated with an aromatherapy steam room, Roman-style dry sauna, heated ceramic loungers and new specialty showers. The project also included scheduled vessel maintenance and inspections.
Previous Dry Dock
September 7, 2013 - October 10, 2013
Shipyard
Navantia Cádiz
Duration
34 days
Disney Magic underwent an extensive stem-to-stern transformation at Navantia's Puerto Real shipyard that substantially redesigned the vessel and added a 20-foot “ducktail” sponson to the stern to improve hydrodynamic performance. The project introduced the AquaDunk three-story waterslide, AquaLab water-play area and Marvel's Avengers Academy, while completely reimagining children's spaces, the atrium, spa, staterooms and adult entertainment district. Dining changes included transforming Topsider Buffet into Cabanas and Parrot Cay into Carioca's, upgrading Animator's Palate and renovating Palo. New adult venues included Fathoms, Keys and O'Gills Pub, while extensive hull, propulsion, plumbing and mechanical work was also completed.
Previous Dry Dock
September 6, 2008 - September 24, 2008
Shipyard
BAE Systems Maritime Solutions Norfolk
Duration
19 days
Disney Magic underwent an extensive refurbishment and technical overhaul at NORSHIPCO in Norfolk, Virginia, as part of its tenth-anniversary maintenance program. The project introduced Mickey's Splash Zone, a 385-square-foot toddler water-play area adjacent to the Mickey Pool, featuring interactive fountains and a Fantasia-inspired design. The adults-only Quiet Cove Pool received cascading waterfalls connecting the two hot tubs, while Cove Café was expanded with additional seating and upgraded furnishings. All passenger staterooms were scheduled to receive 22-inch flat-screen televisions mounted on adjustable swivel arms. The children's activity facilities received a redesigned check-in area in preparation for RFID wristband technology, while additional work included engine maintenance, carpeting replacement, deck improvements and repainting of selected interior spaces.
Previous Dry Dock
September 27, 2003 - October 10, 2003
Shipyard
BAE Systems Maritime Solutions Norfolk
Duration
14 days
Disney Magic underwent a scheduled refurbishment at NORSHIPCO in Norfolk, Virginia, introducing several significant changes to its entertainment and lounge facilities. The ESPN Skybox on Deck 11 was converted into The Stack, a dedicated teen club, while the former Common Grounds teen lounge was transformed into Cove Café, an adults-only coffeehouse and lounge. Off Beat, the dueling-piano venue, was redesigned as Diversions, an Irish-style sports pub. The refurbishment also prepared the ship for the introduction of The Golden Mickeys, a new theatrical production replacing the previous Morty the Magician show. The project combined these passenger-area renovations with scheduled dry-dock maintenance.
Back
Top