• Register Now for a Free Account!
    Unlock additional site access with a free account, takes less than a minute. Register Now!

Cruising Earth

Queen Mary 2 Cruise Ship Tracker

Queen Mary 2 Real-Time Cruise Ship Tracking

Queen Mary 2 Cruise Ship Tracking Map

Loading tracking map...
Loading tracking map...
Tracking Map Legend:
  • Cargo
  • Tanker
  • Cruise / Passenger
  • High Speed
  • Military / Special
  • Fishing
  • Pleasure
  • Unknown

Queen Mary 2 Cruise Ship Details

In Service:2003 | 23 years
Last Refurb:NA
Class:NA
Builder:Chantiers de L'Atlantique
Build Location:Saint-Nazaire, France
Cost:900 Million USD
Call Sign:ZCEF6
Flagged Country:United Kingdom
Passengers:2,620
Crew:1,253
Gross Tons:148,528 GT
Length: 1,132.0 ft
Beam: 135.0 ft
Draft: 33.0 ft
Speed: 26.0 knots / 29.9 mph
Staterooms:NA

Queen Mary 2 Dry Dock History

Next Scheduled Dry Dock
March 31, 2027 - May 9, 2027
Shipyard
Damen Shiprepair Brest
Duration
40 days
Queen Mary 2 is scheduled for a substantial 40-day extended refurbishment at Damen Shiprepair Brest from March 31 through May 9, 2027. Cunard describes the project as a significant investment intended to renew the liner while preserving her Art Deco identity and transatlantic character.

Thirty-one new accommodations will be added: 16 Princess Grill Suites and 15 Britannia staterooms. Every existing Grill Suite will receive new interiors, furnishings and finishes, along with newly designed bathrooms featuring spa-inspired elements. The Queens Grill and Princess Grill restaurants will also be refreshed.

Additional outdoor deck space will be created for relaxation and sea views, while paddle tennis, pickleball and traditional deck games will remain available. Queen Mary 2's kennels will be redesigned and expanded, with greater capacity, a refurbished owners' lounge and a larger outdoor walking area.

Mareel Wellness & Beauty will be transformed, and a new collection of luxury retail stores will be introduced. Illuminations, the ship's planetarium, will receive a major digital upgrade. Other guest areas, cultural facilities and entertainment spaces will be carefully refreshed under a design vision led by original Queen Mary 2 designer Chris Finch.
Previous Dry Dock
October 23, 2023 - November 12, 2023
Shipyard
Damen Shiprepair Rotterdam (Botlek)
Duration
21 days
Queen Mary 2 completed a three-week maintenance and refurbishment project at Damen Shiprepair Rotterdam. The ship's underwater hull was stripped to bare metal and given a new low-friction antifouling coating, while the hull above the waterline, superstructure and funnels received extensive repairs and repainting. All five swimming pools were refurbished, including replacement of tiles and teak and six whirlpool hot tubs, while numerous staterooms, crew spaces and other interior areas were renewed. Technical maintenance, class work and inspections were also carried out during the project, which involved thousands of workers and specialist contractors.
Previous Dry Dock
May 27, 2016 - June 21, 2016
Shipyard
Blohm+Voss
Duration
25 days
Queen Mary 2 underwent an extensive 25-day, approximately $132 million Remastering at Blohm+Voss in Hamburg from May 27 through June 21, 2016. The major refurbishment added 30 Britannia Club balcony staterooms and 15 single staterooms, expanded the ship's kennels and substantially redesigned dining and public spaces. The Britannia Club Restaurant was expanded, Kings Court was extensively reorganized and refreshed, and the former Winter Garden was transformed into the Carinthia Lounge. Additional work included refurbishment of the Grand Lobby and spa areas along with extensive updates to accommodations and other passenger spaces throughout the ship.
Previous Dry Dock
November 24, 2011 - December 6, 2011
Shipyard
Blohm+Voss
Duration
13 days
Queen Mary 2 underwent a major interior refurbishment at Blohm+Voss in Hamburg ahead of her eighth anniversary. All 1,310 staterooms and suites received new carpeting, curtains, bedcovers and other soft furnishings. The Golden Lion Pub was completely redesigned, while the Queens Grill and Princess Grill restaurants, Commodore Club, Veuve Clicquot Champagne Bar, Sir Samuel's Bar and Lounge, Canyon Ranch SpaClub and children's Play Zone received renovations. Tillberg Design developed the updated interiors, with more than 1,000 shipyard workers and subcontractors involved. The project required approximately 29 kilometers of fabric for more than 6,000 individual items, carpeting equivalent to nearly ten football fields, and approximately 20,000 liters of paint and varnish. Technical work included machinery maintenance, vessel inspections and classification surveys.
Previous Dry Dock
October 24, 2008 - November 13, 2008
Shipyard
Blohm+Voss
Duration
21 days
Queen Mary 2 underwent an extensive technical overhaul at Blohm+Voss in Hamburg as part of the shipyard's Refit 2008 program. All four Rolls-Royce Mermaid propulsion pods, including two fixed and two azimuthing units, were partially dismantled and extensively overhauled in cooperation with Rolls-Royce. The ship's three bow thrusters and four stabilizers received maintenance and inspections, while the anchor windlasses underwent brake lining replacement and electric motor inspections. Hull preservation involved the application of approximately 35,000 liters of protective paint. Manufacturer Schat-Harding overhauled 17 lifeboats and tenders, and the shipyard completed cleaning and classification inspections of fuel, freshwater, graywater and blackwater tanks. Additional technical work included servicing sea valves and completing classification-required maintenance intended to prepare the vessel for another five years of operation.
Previous Dry Dock
November 12, 2006 - November 17, 2006
Shipyard
Blohm+Voss
Duration
6 days
Queen Mary 2 underwent a technical dry dock at Blohm+Voss in Hamburg to reinstall a repaired Rolls-Royce Mermaid propulsion pod weighing approximately 270 tons. The pod had been damaged during a departure maneuver at Port Everglades, Florida, in January 2006 and removed during a previous dry dock in May. The vessel subsequently operated with three propulsion pods while the damaged unit underwent repairs. The November project included reinstallation of the propulsion pod and additional work on the Mermaid propulsion system, including bearing replacement and investigation of exciter-frame problems. Safety improvements included installation of sprinkler systems across the ship's passenger balconies, following revised fire-safety requirements. Both bridge wings were also extended by approximately two meters to improve visibility during maneuvering.
Previous Dry Dock
May 6, 2006 - May 10, 2006
Shipyard
Blohm+Voss
Duration
5 days
Queen Mary 2 underwent an unscheduled emergency dry dock at Blohm+Voss in Hamburg to remove a damaged Rolls-Royce Mermaid propulsion pod. The fixed propulsion unit had been damaged during a departure maneuver at Port Everglades, Florida, in January 2006, forcing the ocean liner to operate at reduced speed and resulting in itinerary changes and canceled port calls. During the Hamburg visit, shipyard technicians disconnected and dismantled the approximately 270-ton propulsion pod, using a floating crane to lift it from beneath the stern and transport it to Blohm+Voss workshops for inspection and repairs. The damaged unit was successfully removed approximately 39 hours after docking, with the principal operation completed within 56 hours. Queen Mary 2 returned to passenger service operating on three propulsion pods while the damaged unit underwent repairs, with reinstallation scheduled for a separate dry dock in November 2006.
Previous Dry Dock
November 9, 2005 - November 19, 2005
Shipyard
Blohm+Voss
Duration
11 days
Queen Mary 2 underwent her first scheduled dry dock since entering service in 2004 at Blohm+Voss in Hamburg. The overhaul included classification inspections, extensive hull preservation and repainting, and servicing of the ship's propulsion units, anchor windlasses and all four stabilizers. Approximately 35,000 liters of paint were allocated to the project, covering the vessel's distinctive black, white and red exterior surfaces. Additional work included modifications to restaurant facilities and selected passenger areas. Approximately 1,700 shipyard workers and contractors were involved in the maintenance and refurbishment program, which prepared the ocean liner for continued transatlantic and cruise operations.