Cunard Dry Dock Schedule - Cruising Earth

Cunard Dry Dock Schedule

Cunard Dry Dock Schedule

Cunard Dry Dock Schedule 2026-2027

Cunard - Dry Dock

The Cunard's Dry Dock Schedule includes all current Cunard ships, with details on upcoming scheduled dry docks as well as those recently completed. Cruise lines typically plan routine dry docks up to two years in advance to minimize the need to cancel or modify itineraries after bookings open. However, schedule changes are not uncommon. Unplanned events, such as significant mechanical issues, can require adjustments to the schedule, often creating a cascading effect, resulting in itinerary changes or even cancellations for two or more ships.

While sailing on a freshly refurbished ship straight out of dry dock can be a wonderful experience, a last-minute cruise cancellation due to an extended dry dock period can be deeply disappointing. We recommend keeping this possibility in mind when planning your cruise.

Dry dock (drydock)

Is typically a narrow basin that can be flooded to allow a ship to be floated in, then drained to allow that ship to come to rest on a dry platform. Dry docks are used for the construction, maintenance, and repair of ships, boats, and other watercraft. Dry docks are typically used for major repairs and upgrades where it is easier to work on the watercraft while it is physically out of the water. Technological advancements have made use of floating dry docks an option now, allowing the dry dock to come to the ship.

Wet dock (wetdock)

Is a water-filled basin or berth where the ship remains afloat during maintenance or repairs. Wet docks allow for work above the waterline without draining the water, making them suitable for minor repairs, inspections, loading, unloading, or berthing in areas with tidal variations. Unlike dry docks, wet docks do not provide access to the ship's hull below the waterline and are often used for less invasive tasks or when full dry-docking is not necessary.

The information provided on this page is subject to change at any time. Report any inaccuracies or needed updates in our Cunard Community Forum.

Dry Dock Schedule Last Updated: Sat Jul 11, 2026

Quick Jump to Ship:

Queen Anne Cunard Line - Queen Anne

Queen Anne Dry Dock Schedule

Next Scheduled Dry Dock: N/A

Previous Dry Dock: N/A

Queen Anne entered service in May 2024 as Cunard's newest ship and the first new vessel added to the fleet in more than a decade. As a newly built ship, she has not yet required a scheduled dry dock beyond construction, sea trials, delivery, and routine in-service maintenance. No major post-launch dry dock has been announced.
Queen Elizabeth Cunard Line - Queen Elizabeth

Queen Elizabeth Dry Dock Schedule

Next Scheduled Dry Dock: N/A

Previous Dry Dock: February 25 - March 13, 2025

Queen Elizabeth underwent a significant refit from February 25 to March 13, 2025 at Seatrium's Admiralty Yard in Singapore. The work prepared the ship for her Alaska season from Seattle and her debut Caribbean season from Miami. Updates included refreshed public spaces, wellness and dining enhancements, hotel maintenance, technical work, and general refurbishment throughout the ship. No additional major dry dock has been announced.
Queen Mary 2 Cunard Line - Queen Mary 2

Queen Mary 2 Dry Dock Schedule

Next Scheduled Dry Dock: Late March - May 2027

Previous Dry Dock: June 2025

Queen Mary 2 is expected to enter dry dock in late March 2027 and return to service in May 2027. The refit is expected to include regulatory inspections, technical maintenance, hotel updates, and continued preservation work for Cunard's flagship ocean liner. Queen Mary 2 also completed dry dock work in June 2025, including routine technical maintenance, hull work, public area refreshes, and ongoing upkeep appropriate for the world's last purpose-built ocean liner.
Queen Victoria Cunard Line - Queen Victoria

Queen Victoria Dry Dock Schedule

Next Scheduled Dry Dock: N/A

Previous Dry Dock: May 5 - June 4, 2025

Queen Victoria entered dry dock from May 5 to June 4, 2025 for a partial refit. The project included hotel updates, technical maintenance, cosmetic refreshes, and shipyard work to keep the vessel aligned with Cunard's traditional onboard style. The refit followed other fleet updates completed during 2025 and helped refresh Queen Victoria for continued worldwide service. No additional major dry dock has been announced.