Previous Dry Dock
February 15, 2013 - May 8, 2013
- Shipyard
- Navantia Cádiz
- Duration
- 83 days
Carnival Sunrise, then operating as Carnival Triumph, underwent extensive emergency repairs at BAE Systems Southeast Shipyards in Mobile, Alabama, following an engine-room fire on February 10, 2013, that disabled the ship's electrical power and propulsion systems in the Gulf of Mexico. The fire originated from a failed flexible fuel-oil return line near diesel generator No. 6, damaging generators, electrical cabling and associated machinery. After being towed to Mobile and disembarking its passengers on February 14, the vessel was transferred to the BAE Systems shipyard on February 15 for damage assessment, mechanical and electrical repairs, and restoration of propulsion capability. On April 3, severe winds caused the ship to break free from its moorings, collide with a dredging vessel and sustain additional exterior damage, further complicating the repair project. Following restoration of sufficient propulsion and electrical systems, Carnival Triumph departed Mobile under its own power on May 8 and proceeded to Grand Bahama Shipyard in Freeport for final repairs, safety upgrades and the installation of new Fun Ship 2.0 passenger amenities.